Question no 2529 : S/R list & Planning run

In SAP MRP, which of the following is true about the S/R List ?

(more than one answers)

A)    You can execute an MRP run in MD02 Simulation mode.
B)    In MD43 Single Item Interactive MRP, MRP is not executed until the user selects to do so within the S/R List.
C)    Both MD02 in Simulation mode and MD43 interactive MRP, the user can exit the S/R List without saving the Planning results.
D)    The MD43 interactive mode allows you to copy Simulated Firmed Planned Orders from LTP to the operative S/R List.
E)    While performing planning run using MD02 Simulation mode, the system will first perform an initial planning run before presenting the S/R List, but the user can also execute the MRP run again within the S/R List.
.

1 comment:

  1. These were summary of discussion in my SCM240 class last week. All statements are correct.

    ReplyDelete