Question no 2501 : Long Term Planning Scenario

In SAP PP Planning about Long Term Planning, which of the following planning scenario you can implement within the Long Term Planning Scenario EXCEPT ?

(only one answer)

A)    You can set the Stocks to be zero for LTP run.
B)    You can set to exclude Sales Order for LTP run.
C)    You can set to exclude selected storage location stocks for LTP run.
D)    You can set to ignore firmed receipts.
E)    You can set to include different versions of both active and in-active versions of the Planned Independent Requirement.
.

1 comment:

  1. Check t-code MS31 in the PP-LTP folder, in the Planning Scenario you shall find the parameters you can set to fine-tune the scenarios required for LTP run.