This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Sunday, July 20, 2014

Question no 2484 : Quality Level

In SAP QM, which of the following are NOT TRUE about Quality Level ?

(more than one answers)

A)    You can manuallu create a Quality Level if it does not exist.
B)    Quality Level record can be deleted.
C)    Quality Level can be updated at Lot creation or results of Usage Decision.
D)    Quality Level can only be updated from the results of Usage Decision.
E)    The conditions for inspection stage change in the Quality Level is determined by the Sampling Scheme.
.

3 comments:

  1. A, B) Quality Level can be created manually (with pre-requisites), it can be automatically created, and it can be deleted.

    ReplyDelete
  2. C, D) You can update the Quality Level at Lot creation or at UD, this is decided in the DMR Master data.

    ReplyDelete
  3. E) It is the DMR that provides the control data for Inspection Stage changes in the Quality Level.

    ReplyDelete

Note: Only a member of this blog may post a comment.