As at SAP QM ECC6.0 EhP5, you can assign the DMR (Dynamic Modification Rule) to which of the following ?
(more than one answers)
A) Inspection type in the configuration.
B) Material master in the inspection type detail assigned to the material.
C) Material Specification's inspection characteristics detail.
D) Inspection Plan header.
E) In the inspection plan at the characteristic level.
.
(more than one answers)
A) Inspection type in the configuration.
B) Material master in the inspection type detail assigned to the material.
C) Material Specification's inspection characteristics detail.
D) Inspection Plan header.
E) In the inspection plan at the characteristic level.
.
Definition
ReplyDeleteThe basic data record contains the definition of the inspection stages, the dynamic modification time (at
lot creation or after the usage decision has been made), and the conditions for the inspection stage change. Inspection stage changes occur on the basis of the inspection results that are recorded for inspection lots and inspection characteristics (that is, on the basis of their acceptance or rejection).
Use
You can vary the inspection scope using dynamic modification rules. You can store a dynamic modification rule in one of the following places:
In the inspection plan at the header level
In the inspection plan at the characteristic level
In the inspection setup of the material master record at the inspection type level