This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Showing posts with label PLM305 Unit 03 Bills of Material. Show all posts
Showing posts with label PLM305 Unit 03 Bills of Material. Show all posts

Thursday, August 2, 2018

Question no 3574 : Mateial with IBAU Material Type

In SAP PM as at ECC6.0 EhP6, which of the following are possible for material with IBAU material type ?

(only one answer)

A)  Purchasing.
B)  Material withdrawal.
C)  Reservation creation.
D)  as a BOM Header.
E)  Availability Check.
.

Answer: D

IBAU material type basically has no purchasing or accounting data view, you can use it as a BOM Header.

Wednesday, June 27, 2018

Question no 3552 : IBAU

In SAP PM as at ECC6.0 EhP6, Material Type "IBAU", what are TRUE statements about Materials created using this Material Type ?

(more than one answers)

A)  It is not for Inventory Management.
B)  It can be used for Material BOM Header.
C)  Not Purchasing possible.
D)  It cannot be selected as a Component in the Order for Reservation creation.
E)  It does not have an Accounting data view.
.

Answer: A, B, C, D, E

IBAU material type only provided with Basic and Classification data view. Hence, no Purchasing, IM, or Stock/Qty posting.

Tuesday, November 7, 2017

Question no 3462 : Material BOM Assignment in PM

In SAP PM as at ECC6.0 EhP7, the Material BOM can be Assigned to which of the following ?

(more than one answers)

A)   Maintenance Plan Header.
B)   Maintenance Plan Item.
C)   Task List Header.
D)   Equipment.
E)   Functional Location.
.

Answer: C, D, E

C) as Assembly (IA05,06)
D) as Construction Type in Structure tab in IE01, IE02
E) as Construction Type in Structure tab in IL01, IL02

Thursday, September 18, 2014

Question no 2562 : IBAU (Maintenance Assembly) Material Type

In SAP for PM, the standard material type IBAU (Maintenance Assembly) can be used to create Material Master for Plant Maintenance, which of the following statements are TRUE ?

(more than one answers)

A)   It can be used to create material for a Material BOM Header to assign as construction type to Technical Objects.
B)   It can be used to create a material for a Sub-assembly BOM to assign as an assembly to a Sub-Assembly BOM.
C)   It can be used to assign in the Assembly field in the General Maintenance Task List for component selection for the Operations.
D)   It can be used to link to a Serial number for Equipment-Serial integration.
E)   It can be be included as non-stock item for procurement in the Maintenance Order. 
.

Sunday, September 7, 2014

Question no 2646 : BOM list in Plant Maintenance

In SAP Plant Maintenance as at ECC 6.0, you can assign Material BOM to the following for the purpose of an ability to select a spare parts from the Structure List in the Material BOM ?
(only one answer)

A)   as an Assembly in the Catalog Profile.
B)   as an Assembly in the Maintenance Plan Header.
C)   as an Assembly in the Maintenance Task List Header.
D)   as an Assembly in the Maintenance Order Header.
E)   as an Assembly in the Maintenance Plan Items.
.

Question no 2645 : Assignment a Material BOM in Plant Maintenance

In SAP Plant Maintenance as at ECC 6.0, you can assign Material BOM to the following except ?

(more than one answers)

A)   as a Construction type in the Equipment Master.
B)   as an Assembly in the Maintenance Plan Header.
C)   as an Assembly in the Maintenance Task List Header.
D)   as a Construction type in the Functional Location Master.
E)   as an Assembly in the Maintenance Plan Strategy.
.

Sunday, July 6, 2014

Question no 2414 : Plant Maintenance IBAU Material Type

In SAP Plant Maintenance ECC6.0 as at EhP5, which of the following about the Material Type IBAU are TRUE ?

(more then one answers)

A)    The Material Type do not have Purchasing and Accounting Views.
B)    You can use the Material created with IBAU as a BOM item.
C)    You can use the Material created with IBAU as an Assembly item.
D)    Material created with IBAU can be entered as a construction type in the Equipment master.
E)    Material created with IBAU can be entered as an assembly in the Task List header.
. 

Sunday, August 12, 2012

Question no 1639: IBAU

As at ECC6.0 SAP PM, the material type "IBAU" has which of the following characteristics ?

(more then one answers)

A)   It has Basic view and Classification view only.
B)   It does not have Accounting view and Purchasing view.
C)   It can be used as the header of a material BOM.
D)   It can be assigned as construction type to a technical object.
E)   It can be an assembly material in a multilevel material BOM.
.

Thursday, March 24, 2011

Question no 1019 : Create with reference in PM BOM Categories

In SAP PM, which of the following of BOM creation reference is possible ?

(more the one answers)

A)     Create Functional Location BOM with reference to Material BOM.
B)     Create Functional Location BOM with reference to Equipment BOM.
C)     Create Equipment BOM with reference to Material BOM.
D)     Create Material BOM with reference to Functional Location BOM.
E)     Create Material BOM with reference to Equipment BOM.
.

Monday, March 21, 2011

Question no 1018 : Item Status in Bills of Material

In SAP, the item status of "Plant maintenance" in the BOM item detail is controlled by which of the following parameter ?

(only one answer)

A)    Item Category.
B)    BOM header Usage.
C)    BOM header Status.
D)    Order type.
E)    BOM Category.
.

Tuesday, November 30, 2010

Question no : 741 PM Master Data Find Replacement Equipment

PLM305 Structuring and Managing Technical Objects
Unit 03   Bills of Material

The purpose of the “Find Replacement Equipment” transaction is to:
(only one answer)

(A) Search for Equipments with similar number range.
(B) Search for Equipments with similar construction type.
(C) Search for Equipments with similar notifications.
(D) Search for Equipments with similar malfunction orders.
(E) Search for Equipments with similar characteristics values.
.

Question no : 729 PM Master Data Configurable BOM

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

Which of the following is true when configuring or setting up master data for configurable BOM in Plant Maintenance ?
(more than one answers)

(A) The material must be flagged as configurable.
(B) The configuration profile link the configurable BOM to a class.
(C) The class type used for the configurable material should be class type 300.
(D) Object dependencies are assigned to the BOM item for selecting the right components from the configurable BOM items.
(E) In a configurable bills of material scenario, all BOM items must be assigned with an object dependency.
.

Question no : 728 PM Master Data Rules of Configurable BOM

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

Which of the following provides the means the select the correct material components from the Plant Maintenance configurable bills of material ?
(only one answer)

(A) Object dependency.
(B) ABAP editor.
(C) Configuration profile.
(D) Configuration scenario.
(E) Creation profile.
.

Question no : 727 PM Master Data Configurable BOM Characteristics

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

Which of the following are true for configurable BOM ?
(more than one answers)

(A) Object dependencies are used to select a list of BOM items from a configuration BOM.
(B) Objects of similar construction, the configuration minimizes the resources required for entering BOM.
(C) A configuration profile is required to link the class with the material BOM header.
(D) It is assigned to the Functional Location as a Construction type.
(E) It is assigned to the Equipment master as a Construction type.
.

Question no : 726 PM Master Data IBAU Material Type

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

The purpose of maintenance assembly with material type IBAU is for ?
(more than one answers)

(A) Procurement of material created using this material type.
(B) Stock maintenance assembly in inventory.
(C) Combine material in one node for better structuring.
(D) Non-Stock procurement.
(E) During the processing of maintenance tasks, items marked as a maintenance assembly are displayed as structure elements of an operational system.
.

Question no : 725 PM Master Data Group BOM

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

A Group BOM is created:
(only one answer)

(A) without reference to a plant.
(B) without reference to a material header.
(C) without reference to an equipment number.
(D) with reference to a group number.
(E) with reference to a reference number.
.

Question no : 724 PM Master Data BOM Explosion

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

____________ indicator control the process flow in subsequent areas of work and the selection of items in the BOM explosion.
(only one answer)

(A) Item status.
(B) Item category.
(C) BOM status.
(D) BOM usage.
(E) BOM category.
.

Question no : 723 PM Master Data Non-Stock Scenario

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

For the procurement scenario using Non-Stock material items in the maintenance order, the following processing steps are true ?
(more than one answers)

(A) Purchase requisition is created after the maintenance order has been created.
(B) Purchase requisition is approved after the maintenance order is released.
(C) Purchase order is allowed for goods receipt after the maintenance order is released.
(D) Invoice verification is allowed for the purchase order after the maintenance order is completed or technically completed.
(E) Purchase order can only be created from the purchase requisition after the maintenance order is released.
.

Question no : 722 PM Master Data Non-Stock setup

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

Which of the following date element distinguish a material as Non-Stock or Stock item ?
(only one answer)

(A) Item status.
(B) Account assignment.
(C) Control key.
(D) Item category.
(E) Procurement key.
.

Question no : 721 PM Master Data BOM Assignment

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

The following BOM assignment are possible ?
(more than one answers)

(A) Direct assignment to the functional location.
(B) Direct assignment to the equipment.
(C) Assigning the material BOM to the equipment master as the Construction type.
(D) Assigning the material BOM to the functional location master as the Construction type.
(E) The same material BOM can be assigned to several equipment masters as the Construction type.
.