This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Tuesday, August 28, 2018

Question no 3588 : Capacity Calculation controls

In SAP PP as at ECC6.0 EhP6, which of the following will have an impact on Capacity calculation for an operation in a Production Order ?

(more than one answers)

A)  In-house production time (material master MRP 2 view)
B)  Operation Control Key (Routing operation)
C)  Queue time (Work Center)
D)  Standard values (Routing operations)
E)  Goods Receipt processing time (material master MRP 2 view)
.

Answer: B, D

A) In-house production time is used for MRP Basic scheduling where the system never looks for a Routing. This time parameter is only for MRP run, when converting a Planned Order to Production Order or manually creating a Production Order; the system will never use this time parameter.
B) Operation Control Key has a configuration that decides if Capacity will be calculated.
C) Queue time and Wait time from the Work Center default to the Operation in the Routing are inter-operation times. 
D) Standard values defined in the work center and later entered in the Operation in the Routing, together with the Formula will result in the Capacity Load.
E)  GR processing time is not used for "Scheduled Dates" but only for MRP run or for "Basic Dates".

Sunday, August 26, 2018

Question no 3587 : Capacity Load in Production Order

In SAP PP as at ECC6.0 EhP6, select the time parameters can do not affect the calculation of capacity load for work center of an operation in a production order ?

(more than one answers)

A)  Setup time.
B)  Processing time.
C)  Wait time.
D)  Move time.
E)  Queue time.
.

Answer: C, D, E

Wait, Move, Queue are all inter-operation times with no impact on capacity loads of the work center.

Thursday, August 23, 2018

Question no 3586 : Inventory Management Characteristics

In SAP MM as at ECC6.0 EhP6, evaluate the following correct statement ?


A)  GR-Blocked Stock can be valuated and non-valuated.
B)  Goods Receipt can generate material document or without material document.
C)  Goods Receipt can generate accounting document or without accounting document.
D)  GR-Blocked Stock can be for material PO or non-material PO.
E)  GR=Blocked Stock can be for PO or Scheduling agreements.
.

Answer: A, C, E

B) All goods movement will generate material document.
C) Generating accountign documents depends on scenario.

Wednesday, August 22, 2018

Question no 3585 : BOM explosion in Sales Order

In SAP SD as at ECC6.0 EhP6, which of the following are the required configuration if a BOM content is to be exploded into the Sales Order item ?


(only one answer)

A)  BOM application must be assigned to the Item Category.
B)  BOM application must be assigned to the Order Type.
C)  BOM application must be assigned to the Delivery Category.
D)  BOM application must be assigned to the Sales Area.
E)  BOM application must be assigned to the Delivery Plant.
.

Answer: A

IMG - Sales and Distribution - Sales - Sales Documents - Sales Document items - Define Item Categories

Monday, August 20, 2018

Question no 3584 : Equipmnet characteristics

In SAP PM as at ECC6.0 EhP6, an Equipment can be ____________________ .

(more than one answers)

A)  assigned to one or more Permits.
B)  assigned to one or more material-serial numbers.
C)  assigned to one or more functional locations.
D)  assigned to one or more construction types.
E)  assigned to one or more maintenance items.
.

Answer: A, E

EQ assignment to mateiral-serial/FL/construction type is only one allowed for each equipment.

Sunday, August 19, 2018

Question no 3583 : Creating a Purchase Order

In SAP MM as at ECC6.0 EhP6, which of the following Material Master data view is not necessary when creating a Purchase Order ?

(more than one answers)

A)  Purchasing data view.
B)  MRP data view.
C)  Forcasting data view.
D)  Plant/Storage data view.
E)  Accounting data view.
.

Answer: B, C, D, E

It is possible that you only need Purchasing data view for procurement of non-stock scenario but for valuated stock scenario, the accounting data view then is also relevant. Service material type DIEN and Non-Valuated Material procurement also need not have an Accounting data view.

Thursday, August 16, 2018

Question no 3582 : Material Document changes

In SAP MM as at ECC6.0 EhP6, which of the following can be changed after the Material Document is posted ?

(only one answer)

A)   Delivery note.
B)   Bill of Lading.
C)   Quantity.
D)   Text.
E)    Reason code.
.

Answer: D

Header Text and Item Text.

Wednesday, August 15, 2018

Question no 3581 : Invoice Verification Reference Documents

In SAP MM as at ECC6.0 EhP6, which of the following can be referenced for Online manual Invoice Verification via MIRO ?

(more than one answers)

A)   Material Document.
B)   Purchase Order.
C)   Service Entry Sheet.
D)   Scheduling Agreement.
E)   Contract.
.

Answer: B, C, D

Not Material Doc. (Auto invoice possible via Material Doc.)
Contract is not possible (GR also not possible)

Monday, August 13, 2018

Question no 3580 : Vendor Master data structure

In SAP MM as at ECC6.0 EhP6, which of the following data structures are at the General Data level of the Vendor Master ?

(more than one answers)

A)   Address.
B)   Bank data.
C)   Payment term.
D)   Currency.
E)   In-co term.
.

Answer: A, B

XK01, XK02, XK03

Sunday, August 12, 2018

Question no 3579 : Vendor Sub-Range

In SAP MM as at ECC6.0 EhP6, which of the following activates the usage of Sub-Range when creating a Vendor Master ?

(only one answer)

A)  Plant Parameter.
B)  Purchasing Group.
C)  Vendor Account Group.
D)  Company Code Parameter.
E)  No setting required.
.

Answer: C

OMSG

Thursday, August 9, 2018

Question no 3578 : Object Dependency for Configurable Task List

In SAP PM as at ECC6.0 EhP6, which of the following Object Dependency type is assigned to the Operation of the Configurable Task List for Operation Selection ?

(only one answer)

A)  Selection Condition.
B)  Action.
C)  Procedure.
D)  Net.
E)  Pre-Condition.
.

Answer: A

Selection Condition is for selecting an object.
Action and Procedure are for making selection mandatory and set values.
Net is a more complex rule writing usually used for calculations.
Pre-Condition is like (if then else in programming)

Material Management - Contact Person

Wednesday, August 8, 2018

Question no 3577 : Configurable Task List

In SAP PM as at ECC6.0 EhP7, a _______________ links a Variant Class to a General Task List to declare it as a Configurable Task List.

(only one answer)

A)   Configuration Profile.
B)   Object Dependency.
C)   KMAT Material.
D)   Object Link.
E)   Configurable Equipment.
.

Answer: A

CU41 Configuration Profile.

Monday, August 6, 2018

Question no 3576 : Serial Number Profile in PM

In SAP PM as at ECC6.0 EhP6, the Serial Number Profile is assigned to which of the following object ?

(only one answer)

A)  Material Master.
B)  Equipment.
C)  Serial Master.
D)  Maintenance Profile.
E)  Planning Plant.
.

Answer: A

Plant/Storage view 2

Sunday, August 5, 2018

Question no 3575 : Item Category for Material Withdrawal

In SAP PM as at ECC6.0 EhP6, which of the following standard SAP Item Category in Plant Maintenance Order allow Material Withdrawal ?

(more than one answers)

A)   "L".
B)   "N".
C)   "T".
D)   "R".
E)   "S".
.

ANswer: A, D

"L" Stock item, "R" Variable Size item.

Thursday, August 2, 2018

Question no 3574 : Mateial with IBAU Material Type

In SAP PM as at ECC6.0 EhP6, which of the following are possible for material with IBAU material type ?

(only one answer)

A)  Purchasing.
B)  Material withdrawal.
C)  Reservation creation.
D)  as a BOM Header.
E)  Availability Check.
.

Answer: D

IBAU material type basically has no purchasing or accounting data view, you can use it as a BOM Header.

Wednesday, August 1, 2018

Question no 3573 : Installation of Technical Object in Plant Maintenance

In SAP PM as at ECC6.0 EhP6, which of the following are TRUE regarding Technical Object Installations ?

(more than one answers)

A)   Install Functional Location to a Superior Functional Location
B)   Install Functional Location to a Superior Equipment.
C)   Install Equipment to a Superior Equipment.
D)   Install Equipment to a Superior Functional Location.
E)   Install an Equipment Hierarchy to a Superior Functional Location.
.

Answer: A, C, D, E

B) an FL cannot to assigned to a EQ as its superior.