In SAP PP Routing (ECC6.0 Ehp5), which of the following does the Operation Control Key in the Routing can control EXCEPT which one ?
(only one answer)
A) Costing of the Operation.
B) Allowed component assignment to the Operation.
C) Scheduling of the Operation.
D) Confirmation of the Operation.
E) Capacity Calculation for the Operation.
.
(only one answer)
A) Costing of the Operation.
B) Allowed component assignment to the Operation.
C) Scheduling of the Operation.
D) Confirmation of the Operation.
E) Capacity Calculation for the Operation.
.
Answer: B
ReplyDeleteAs at ECC6.0 EhP5, the Control Key do not yet have any features to determine component allocation to the operation.