In SAP PP, the Range of Coverage Profile does which of the following ?
(only one answer)
A) Calculates the Safety Stocks.
B) Determine the Lot Sizing Rule.
C) Determine the Periods of Planning to cover Demands in the future.
D) Provides propagation of demand supply within the horizon in the Profile.
E) It is a higher priority compared to the Planning Horizon set at the MRP Group parameter.
.
(only one answer)
A) Calculates the Safety Stocks.
B) Determine the Lot Sizing Rule.
C) Determine the Periods of Planning to cover Demands in the future.
D) Provides propagation of demand supply within the horizon in the Profile.
E) It is a higher priority compared to the Planning Horizon set at the MRP Group parameter.
.
It does safety stock calculation dynamically.
ReplyDelete