Question no 2504 : Planned Independent Requirement

In SAP PP Demand Management, the Planned Independent Requirement versions can be assigned with which of the following ?

(more than one answers)

A)   Each PIR version can only have one requirement type.
B)   The schedule lines in each PIR version can have an individual requirement type.
C)   The schedule line can be assigned to a Production Version.
D)   Each PIR version can be assigned to exactly one Production Version.
E)   Only active PIR version's schedule line can be assigned with Production Versions.
.

3 comments:

  1. A, B) Each PIR version can have a requirement type (mandatory) but not the schedule lines within it. Which means all schedule lines for each PIR version follows the requirement type assigned at the PIR version. (only one requirement type per PIR version)

    ReplyDelete
  2. C, D, E) The Production Version cannot be assigned at the PIR version level. Each schedule line within the PIR version can be assigned to the Production Version and not necessary the same PV. The PV assignment to the schedule lines are not dependent of active or non-active setting of the PIR version.

    ReplyDelete