Question no 3924 : Goods Receipt Check

In SAP MM as at ECC6.0 EhP6, the following Checks are possible at the point of Goods Receipt EXCEPT ?

(only one answer)

A)  Tolerance check of the Material Moving Average Price.
B)  Tolerance check of Purchase Order Quantity against the Standard Quantity in the Info Record.
C)  Expiry data check for Total Shelf Life against Remaining Shelf Life days.
D)  Over and Under Tolerance Limits Check on Quantities.
E)  B1 and B2 Tolerance Limit check on Order Price Quantity.
.

Answers: B

B)  Tolerance check of Purchase Order Quantity against the Standard Quantity in the Info Record, this check is NOT Available in ECC6.0 EhP6.

A)  Tolerance check of the Material Moving Average Price.

C)  Expiry data check for Total Shelf Life against Remaining Shelf Life days.

D)  Over and Under Tolerance Limits Check on Quantities.

E)  B1 and B2 Tolerance Limit check on Order Price Quantity.

Thursday, February 24, 2022

Question no 3923 : Goods Issue with reference

In SAP MM as at ECC6.0 EhP6, which of the following documents allow Goods Issue with reference to Order ?

(more than one answers)

A)  Process Order.
B)  Network Order.
C)  Maintenance Order.
D)  Production Order.
E)  Planned Order.
.

Answers: A, B, C, D

Goods Issue with reference to Order:
. PPPIs Process Order
. PPDIs Production Order
. PS Network Order
. CS Service Order
. PM Maintenance Order 
Goods Issue can also be reference to Reservation.

Monday, February 21, 2022

Question no 3922 : Item Category in a PO

In SAP MM as at ECC6.0 EhP6, which of the following scenarios the Item Category in a Purchase Order provides ?

(more than one answers)

A)  Pipeline.
B)  Consignment.
C)  Asset.
D)  Subcontracting.
E)  Limits.
.

Answers: B, D, E

A) There are no Purchasing Scenario for Pipeline.
B) Consignment is via item category "K".
C) Asset is achieved via Account Assignment "A" in Standard SAP.
D) Subcontracting is via item category "L".
E) Item Category "B" is for Blanket PO with the Limits TAB.
.

Wednesday, February 16, 2022

Question no 3921 : Scheduling Agreement Reference

In SAP MM as at ECC6.0 EhP6, which of the following are TRUE about creating Scheduling Agreements (SA)?

(more than one answers)

A)  You can create SA with reference to PR.
B)  You can create SA with reference to Quotation.
C)  You can create SA with reference to PO.
D)  You can create SA with reference to Contract.
E)  An MRP run can create a SA.

Answers: A, B, D

C) It is not possible to create PO with reference to SA
You can create PO the following ways:
Create PO with reference to PR, Quotation, another PO, or Contract

E) MRP Run cannot create SA (Scheduling Agreement)
MRP can generate Planned Order, PR, or Delivery Schedule for Scheduling Agreement

Monday, February 14, 2022

Question no 3920 : Material Master Field Selection

In SAP MM as at ECC6.0 EhP6, which of the following Controls Fields Selections in the Material Master ?

(more than one answers)

A)  Industry Sector.
B)  Material Group.
C)  Material Type.
D)  Plant.
E)  MRP Group.
.

Answers: A, C, D

Influencing Factors for Material Master Field Selection:
. Industry Sector
. Material Type
. Plant
. Transaction Code



 

Wednesday, February 9, 2022

Question no 3919 : Material Type Control Parameters

In SAP MM as at ECC6.0 EhP6, which of the following processes are activated or influenced (controlling parameters) via the Material Type Configuration ?

(more than one answers)

A)  MPN.
B)  Subcontracting.
C)  Configurable Material.
D)  Pipeline.
E)  Consignment.
.

Answers: A, C, D

OMS2 transaction code to configure the Material Type
(or Menu Path via SPRO - Reference IMG - Logistics General - Material Master - Basic Settings - Material Types - Define Attributes for Material Types)








Monday, February 7, 2022

Question no 3918 : Equipment Category

In SAP PM as at ECC6.0 EhP6, which of the following parameters are configured via the Equipment Category ?

(more than one answers)

A)  External and/or Internal Number Range.
B)  Allowed installation to Functional Location.
C)  Field Selection.
D)  Allowed assignment of Construction Type.
E)  Construction Type and Serial-Material synchronization.
.

Answers: A, B, C, E

D) Construction Type are always possible for EQ and FL regardless of the EQ category or FL category.

The following are features possible for Equipment Category:









Wednesday, February 2, 2022

Question no 3917 : Component (Material) selection in the Maintenance Order

In SAP PM as at ECC6.0 EhP6, which of the following are possible methods for component selection in the Maintenance Order ?

(more than one answers)

A)  Material BOM assigned to the Work Center of the Operation. 
B)  Technical Object's Construction Type BOM.
C)  Technical Object's BOM.
D)  Internet Catalog.
E)  Visual Enterpriser Spare Parts.
.

Answers: B, C, D, E

B) EQ and FL entered as Reference Object in the MO can have a Construction Type with a Material BOM.
C) EQ and FL itself can have EQ BOM or FL BOM.
D) If Web Catalog has been setup for the Order Type.
E) Visual Enterprise Spare Parts via DMS assigned to the Operation allows Spare Parts selection via a Graphical interface.



Tuesday, February 1, 2022

Question no 3916 : One Notification multiple Maintenance Order

In SAP PM as at ECC6.0 EhP6, which of the following method allow One Maintenance Notification to link/generated into More than one Maintenance Order ?

(only one answer)

A)  MEB.
B)  IW38.
C)  IW28.
D)  Maintenance Plan Scheduling.
E)  MRP run.
.

Answer: A