Question no 2497 : Reduction Strategy

In SAP PP or PPPI, the Reduction Strategy in the Routing operations to reduce operation times at MRP run can reduce the following time elements EXCEPT ?

(more than one answers)

A)    Queue time.
B)    Wait time.
C)    Move time.
D)    Float before production.
E)    Float after production.
.

2 comments:

  1. There are two methods of reduction strategy :
    1) Reducing floats before and after production (this is done via IMG for scheduling parameters for planned orders for the plant, order type, and if necessary production scheduler).
    2) Reducing specific time elements in the Routing operations via the Reduction Strategy assigned in the Operation detail.