Question no 2471 : MRP Area definition

In SAP MM/PP MRP, when defining the MRP Area which of the follwing are possible ?

(more than one answers)

A)    MRP Area is activated in the Client level.
B)    MRP Area is activated at the Plant level.
C)    Only one receiving Storage Location can be assigned to each MRP Area.
D)    One of more Storage Location can be assigned to the MRP Area for keeping stocks and withdrawal.
E)    The external number for the MRP Area for Storage Location must be 5 or more characters.

3 comments:

  1. A, B) MRP Area is activated at Client level as at ECC6.0 EhP6

    ReplyDelete
  2. C, D) Assigning exactly one Receiving Storage Location to an MRP arae is optional. However, you must assign a minimum of one storage location for stock keeping and material withdrawal.

    ReplyDelete
  3. E) 4 or less alphnumeric key is reserved for defining MRP Area equals to the Plant. Therefore, the external number for MRP Area for storage locations mist be 5 or above.

    ReplyDelete