Question no 2537 : Materials for PP MRP run

In SAP MRP, which of the following material are not subjected to PP MRP run ?

(more than one answers)

A)   Material with Item Category 'L' in the Material BOM.
B)   Material with Item Category 'N' in the Material BOM.
C)   Material with the 'Bulk' indicator in the Material BOM.
D)   Material without the Costing Relevancy in the Material BOM.
E)   Material in the Material BOM which is not allocated to the Routing Operation.
.

2 comments:

  1. B) Item Category 'N' materials in the material BOM are excluded from MRP run. However a Purchase Requisition will be created when the Planned Order is converted to Production Order.

    ReplyDelete
  2. C) 'Bulk' materials are excluded from MRP run. MRP for these materials are based on Consumption. No dependent requirements are created for 'Bulk' materials. Here we distinguish between PP MRP and MM CBP.

    ReplyDelete