This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Showing posts with label Test : Quality Management - Calibration. Show all posts
Showing posts with label Test : Quality Management - Calibration. Show all posts

Friday, July 31, 2026

Question 4153 : Calibration Planning characteristics

In SAP S/4 1909, which of the following are TRUE about Calibration Planning for Equipment's using the QM module's assistance ?

(more than one answers)

A) Measuring Points in the Equipment Master are necessary for Calibration Planning.
B) Option to use either use Inspection Plan or Maintenance Task List for Calibration Planning.
C) Inspection Point assignment in the Maintenance Task List header is Mandatory for Calibration Planning.
D) Both Functional Locations and Equipment can be assigned in the Calibration Plans
E) Cycle Modification Factor can be entered during Results Recording or Usage Decision.

.
Answer: C, D

A) No. Measuring Point either in EQ or FL is not mandatory for Calibration Planning, meaning the calibration results can be recorded in the Inspection Lot without updating the measuring document to the measuring points. 
B) No. not in the Inspection Plan, but the Plant Maintenance's Task List is used to define setup the Inspection Characteristics required for the Calibration. 
C) Yes, An appropriate Inspection Point must be assigned to the Maintenance Task List Header.
D) Yes, In SAP, both FL and EQ can be assigned in the Calibration Plans.
E) No, Only at UD that the Cycle Modification Factor can be changed.


Sunday, August 9, 2020

Question no 3719 : Master Inspection Characteristics and Measuing Point

In SAP PM/QM as at ECC6.0 EhP6, which of the following is the use of same Classification Characteristics assigned to the Measuring Point and Master Inspection Characteristics ?

(only one answer)

A)  Inspection Lot creation pre-requisite.
B)  Update Calibration results from QM Results Recording to Measurement Documents.
C)  Allow Maintenance Plan creation.
D)  Link the Equipment Master to the Inspection Lot.
E)  All of the above.
.

click "1 comment" for suggested solutions

Wednesday, April 22, 2020

Question no 3691 : Calibration Plan Pre-requisite

In SAP PM as at ECC6.0 EhP6, which of the following are the necessary setup for Calibration scenario for PM Equipment via PM-QM integration ?

(more than one answers)

A)  The correct Inspection Type assigned to the Maintenance Order Type.
B)  Maintenance Plan Category will Call Object "Inspection Lot".
C)  General Task List with Strategy Plan is Mandatory for Calibration scenario.
D)  General Task List with Inspection Point at the Header.
E)  Equipment Master activated for Calibration Planning.
.

Click on the "1 comment" button to check the Suggested answers


Wednesday, April 3, 2019

Question no 3635 : Inspection Type for Calibration

In SAP PM/QM as at ECC6.0 EhP7, which of the following is the correct standard Inspection Type for Plant Maintenance Calibration processing ?

(only one answer)

A)  "4".
B)  "11".
C)  "14".
D)  "17".
E)  "24".
.

Answer: C

Inspection Type "14".

Wednesday, May 24, 2017

Question no 3390 : Equipment Calibration using QM

In SAP PM-QM as at ECC6.0 EhP6, which of the following links the Measuring Point to the Master Inspection Characteristics so that Calibration Results from the Result Recording are written automatically as Measurement Documents for the Measuring Point ?

(only one answer)

A)   Inspection Point.
B)   Dynamic Modification Rule.
C)   Classification Characteristics.
D)   Unit of Measure.
E)   Inspection Type.
.

Answer: C

Measuring Point - Classification Characteristics - Master Inspection Characteristics

Tuesday, March 10, 2015

Question no 2746 : QM Calibration for Plant Maintenance

In SAP QM as at ECC6.0 EhP5, which of the following are appropriate use of setup applicable for Equipment Calibration using the QM module ?

(more than one answers)

A)   Sample Procedure with a Fixed Sample Size of 1.
B)   Inspection Origin 14 for PM Calibration do not require Sampling Procedure.
C)   The Sampling Procedure used require an Inspection Point indicator.
D)   The General Maintenance Task List used must have an Inspection Point aapropraite for PM use.
E)   The Equipment Master must be assigned with Indpection Type of Origin '14'.
.

Sunday, March 8, 2015

Question no 2708 : Inspection Containers in the Inspection Lot for Test Equipment Calibration

In SAP QM as at ECC6.0 EhP6, in order for an inspection lot to be able to perform calibration for multiple equipments, the system has to generate inspection requirements for every equipment with 'containers' within one inspection lot, how can that be possible ?

(only one answer)

A)   Inspection Point assigned to the Inspection Plan Header.
B)   Inspection Point assigned to the Equipment Category.
C)   No setup required, this is built-in capability in the Maintenance Plan functionality.
D)   Inspection Point assigned to the Maintenance Task List.
E)   This is not possible, one inspection lot can only perform calibration for one equipment.
.

Question no 2707 : Task List for Calibration of Test Equipment

In SAP QM as at ECC6.0 EhP6, which of the following task list types can be used of Test Equipment Calibration via QM ? (also relevant for PM examination knowledge)

(more than one answers)

A)   Routing.
B)   General Maintenance Task List.
C)   Equipment Task List.
D)   Functional Location Task List.
E)   Inspection Plan.
.

Question no 2706 : Calibration recording integration

In SAP QM as at ECC6.0 EhP6, the results recording on the Inspection Characteristics can be written as Measuring Documents of the Measuring Points in the Equipment is possible when ________________________ . (also relevant for PM Certification knowledge)

(only one answer)

A)   The Master Inspection Characteristics is linked to the Characteristics used to create the Measuring Point in the Equipment Master.
B)   The Master Inspection Characteristics is linked to the Equipment Master classification characteristics.
C)   The Equipment category in the customizing was set with an indicator that activates the PM-QM integration for data transfer from QM to PM.
D)   The User profile has been assigned a transfer data option from QM to PM.
E)   The Master Inspection Characteristics was set with a 'transfer' indicator.
.

Saturday, March 7, 2015

Question no 2699 : Calibration Plans

In SAP QM ECC6.0 EhP6, which of the following scenarios are possible for recommendations for Calibration Plan for Test Equipments ?

(more than one answers)

A)  IP41 Single Cycle Time based.
B)  IP41 Single Cycle Counter based.
C)  IP42 Strategy Plan.
D)  IP43 Multi-Counter Plan.
E)  IP40 Service Procurement for External Calibration.

Sunday, September 8, 2013

Question no 2029 : Master Inspection Characteristics and General Characteristics

In SAP QM ECC6.0, The link between master inspection characteristics and general characteristics enables which of the following ?

(only one answer)

A)   the automatic transfer of inspection results to the batch classification.
B)   the automatic transfer of inspection results to the measuring document during maintenance calibration.
C)   the automatic transfer of inspection results to the material master classification view.
D)   the automatic transfer of inspection results to the inspection method.
E)   the automatic transfer of inspection results to the inspection task list.
.