This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Tuesday, November 30, 2010

Question no : 745 PM Master Data Counter for Vehicle consumptions

PLM305 Structuring and Managing Technical Objects
Unit 05 Measuring Points and Counters

When you perform the transaction “Enter Usage for Vehicles”, the following processes can be accomplished.
(more than one answers)

(A) Record fuel consumption for a vehicle at a particular gas station.
(B) Record counter readings for distance traveled by the vehicle.
(C) Record fuel type consumed by the vehicle at the gas station.
(D) Reduce the fuel stock at the storage location of the gas station.
(E) Record the time of the refueling is performed.
.

Question no : 744 PM Master Data Creating Measuring Point

PLM305 Structuring and Managing Technical Objects
Unit 05 Measuring Points and Counters

When creating a new measuring point, we like to check whether existing measuring points have similar measuring positions assigned; how would you proceed ?
(only one answer)

(A) Create the new measuring point with reference to an existing measuring point.
(B) Create the new measuring point with Category “U” (Unique Measuring Position).
(C) Create the new measuring point with a characteristic that has Category “U” (Unique Measuring Position).
(D) Execute the list display for measuring points to check whether the intended new measuring position exists in any current measuring points. Create the new measuring point accordingly after that.
(E) Create the new measuring point with the intended measuring position. Execute the list display for all measuring points including the newly created one. If other measuring points contains the measuring position, change new measuring point and set it with deletion flag.
.

Question no : 743 PM Master Data Creating Measuring Point

PLM305 Structuring and Managing Technical Objects
Unit 05 Measuring Points and Counters

The following is not true about measuring points and counters creation.
(more than one answers)

(A) They can be created in the technical objects without characteristics.
(B) They can be created directly within the technical objects.
(C) They must first be created as a master data before assigning to the technical objects.
(D) They must have a measuring position assignment.
(E) They must have a released status before measurement readings can be entered.
.

Question no : 742 PM Master Data Characteristics for Measuring Point

PLM305 Structuring and Managing Technical Objects
Unit 05 Measuring Points and Counters

When creating characteristics to be used in measuring points as counters, the characteristics must:
(more than one answers)

(A) be assigned to the class type valid for the relevant technical objects.
(B) data format is Numeric.
(C) have an appropriate unit of measure.
(D) technical object assignment allowed indicator.
(E) have a catalog profile.
.

Question no : 741 PM Master Data Find Replacement Equipment

PLM305 Structuring and Managing Technical Objects
Unit 03   Bills of Material

The purpose of the “Find Replacement Equipment” transaction is to:
(only one answer)

(A) Search for Equipments with similar number range.
(B) Search for Equipments with similar construction type.
(C) Search for Equipments with similar notifications.
(D) Search for Equipments with similar malfunction orders.
(E) Search for Equipments with similar characteristics values.
.

Question no : 740 PM Master Data Measurement Documents

PLM305 Structuring and Managing Technical Objects
Unit 05 Measuring Points and Counters

A measurement document contains the following data:
(more than one answers)

(A) User.
(B) Measurement result data
(C) Accounting information.
(D) Additional information (as short and long text)
(E) Technical object classification data.
.

Question no : 739 PM Master Data Measuring Point preparation

PLM305 Structuring and Managing Technical Objects
Unit 05 Measuring Points and Counters

Before you begin maintaining the measuring points for your objects, you should: (only one answer)

(A) Classify the relevant objects using its respective class types.
(B) Create a classification view in the technical objects.
(C) Create all the characteristics to be used for measuring points in the classification system.
(D) Activate the equipment category or functional location category for measuring point assignment.
(E) Create the necessary object dependencies for the measuring points.
.

Question no : 738 PM Master Data Measuring Reading List

PLM305 Structuring and Managing Technical Objects
Unit 05 Measuring Points and Counters

The measuring reading entry list …
(more than one answers)

(A) Can include both Function location and Equipment Measuring Points in a single Entry List.
(B) Eliminates the need for measurement document creation.
(C) Allows you to enter new measurement points directly from this screen.
(D) Allows only readings from a single object in a list.
(E) Combines different measurement points and counters in a list is possible.
.

Question no : 737 PM Master Data Serial Number Usage

PLM305 Structuring and Managing Technical Objects
Unit 04 Serial Numbers

The following statements are true about serial number usage for plant maintenance:
(more than one answers)

(A) It is possible to carry out physical stock count.
(B) If several users simultaneously attempt to create serial numbers for the same material number, a lock ensures consistent number assignment
(C) The serial number master record provides stock information for stock type, plant, and storage location.
(D) The combination material/serial number/equipment number can be unique.
(E) It is now possible to use the IE4N transaction for simultaneous Removal/stock return or Installation/goods issue.
.

Question no : 736 PM Master Data IE4N

PLM305 Structuring and Managing Technical Objects
Unit 04 Serial Numbers

When removing equipment that is serialized with a material number from the functional location using the transaction IE4N :
(more than one answers)

(A) It is placed in the storage location.
(B) It is removed from the storage location.
(C) It requires a movement type.
(D) It generates a notification order.
(E) It generates a material document number.
.

Question no : 735 PM Master Data Serial Number List Editing

PLM305 Structuring and Managing Technical Objects 
Unit 04 Serial Numbers

The “Listing Editing – Create” transaction in serial number allows you to:
(only one answer)

(A) Create serial numbers.
(B) Create report variant.
(C) Create field selection.
(D) Create a report list.
(E) Create a material number. 
.

Question no : 734 PM Master Data IE4N

PLM305 Structuring and Managing Technical Objects
Unit 04 Serial Numbers

The transaction “Remove/Install with goods movement” where when you use the “install” function will:
(more than one answers)

(A) create an accounting document.
(B) remove stock from the storage location.
(C) create a cost accounting document.
(D) install the equipment in a functional location.
(E) status “ESTO” is now updated to “INST” in the equipment master.
.

Question no : 733 PM Master Data Serial Number Profile

PLM305 Structuring and Managing Technical Objects
Unit 04 Serial Numbers

The serial number profile provides the following control features:
(more than one answers)

(A) Ensuring the equipment number and its serial number assigned to it is synchronous.
(B) Ensuring the construction type and material number are kept synchronous for a serialized equipment.
(C) Ensuring that the serial number master record must first be created before it is used in the plant maintenance transactions.
(D) Ensuring the system to do a stock check during serial number assignment.
(E) Entry that determines whether or not an equipment master record should be created for each number when assigning serial numbers.
.

Question no : 732 PM Master Data Serial Number Master Data

PLM305 Structuring and Managing Technical Objects
Unit 04 Serial Numbers

Serial number master records update stock information for:
(more than one answers)

(A) Plant, storage location data.
(B) Unrestricted stock, Stock returns from customer.
(C) Special stock scenario.
(D) All non-stock items with outstanding purchase orders.
(E) All stock types.
.

Question no : 731 PM Master Data Serial Number Profile Configuration

PLM305 Structuring and Managing Technical Objects
Unit 04 Serial Numbers

The serial number profile configuration controls the following ?
(more than one answers)

(A) Serial number for a master object must be in existence when goods issue is performed.
(B) Serial number for a master object need not be in existence and is generated only when goods issue is performed.
(C) Equipment number is not required during goods issue as it can be generated.
(D) It is possible to perform goods receipt without equipment number but with serial number.
(E) Which equipment category that the system uses when assigning serial numbers automatically in the case of equipment master records.
.

Question no : 730 PM Master Data One-Step Installation

PLM305 Structuring and Managing Technical Objects
Unit 04 Serial Numbers

In a single step, you can remove a piece of equipment from a storage location and install it at another piece of equipment or a functional location, which transaction would you recommend to perform this task ?
(only one answer)

(A) IE02.
(B) IL02.
(C) IH01.
(D) MIGO.
(E) IE4N.
.

Question no : 729 PM Master Data Configurable BOM

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

Which of the following is true when configuring or setting up master data for configurable BOM in Plant Maintenance ?
(more than one answers)

(A) The material must be flagged as configurable.
(B) The configuration profile link the configurable BOM to a class.
(C) The class type used for the configurable material should be class type 300.
(D) Object dependencies are assigned to the BOM item for selecting the right components from the configurable BOM items.
(E) In a configurable bills of material scenario, all BOM items must be assigned with an object dependency.
.

Question no : 728 PM Master Data Rules of Configurable BOM

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

Which of the following provides the means the select the correct material components from the Plant Maintenance configurable bills of material ?
(only one answer)

(A) Object dependency.
(B) ABAP editor.
(C) Configuration profile.
(D) Configuration scenario.
(E) Creation profile.
.

Question no : 727 PM Master Data Configurable BOM Characteristics

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

Which of the following are true for configurable BOM ?
(more than one answers)

(A) Object dependencies are used to select a list of BOM items from a configuration BOM.
(B) Objects of similar construction, the configuration minimizes the resources required for entering BOM.
(C) A configuration profile is required to link the class with the material BOM header.
(D) It is assigned to the Functional Location as a Construction type.
(E) It is assigned to the Equipment master as a Construction type.
.

Question no : 726 PM Master Data IBAU Material Type

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

The purpose of maintenance assembly with material type IBAU is for ?
(more than one answers)

(A) Procurement of material created using this material type.
(B) Stock maintenance assembly in inventory.
(C) Combine material in one node for better structuring.
(D) Non-Stock procurement.
(E) During the processing of maintenance tasks, items marked as a maintenance assembly are displayed as structure elements of an operational system.
.

Question no : 725 PM Master Data Group BOM

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

A Group BOM is created:
(only one answer)

(A) without reference to a plant.
(B) without reference to a material header.
(C) without reference to an equipment number.
(D) with reference to a group number.
(E) with reference to a reference number.
.

Question no : 724 PM Master Data BOM Explosion

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

____________ indicator control the process flow in subsequent areas of work and the selection of items in the BOM explosion.
(only one answer)

(A) Item status.
(B) Item category.
(C) BOM status.
(D) BOM usage.
(E) BOM category.
.

Question no : 723 PM Master Data Non-Stock Scenario

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

For the procurement scenario using Non-Stock material items in the maintenance order, the following processing steps are true ?
(more than one answers)

(A) Purchase requisition is created after the maintenance order has been created.
(B) Purchase requisition is approved after the maintenance order is released.
(C) Purchase order is allowed for goods receipt after the maintenance order is released.
(D) Invoice verification is allowed for the purchase order after the maintenance order is completed or technically completed.
(E) Purchase order can only be created from the purchase requisition after the maintenance order is released.
.

Question no : 722 PM Master Data Non-Stock setup

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

Which of the following date element distinguish a material as Non-Stock or Stock item ?
(only one answer)

(A) Item status.
(B) Account assignment.
(C) Control key.
(D) Item category.
(E) Procurement key.
.

Question no : 721 PM Master Data BOM Assignment

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

The following BOM assignment are possible ?
(more than one answers)

(A) Direct assignment to the functional location.
(B) Direct assignment to the equipment.
(C) Assigning the material BOM to the equipment master as the Construction type.
(D) Assigning the material BOM to the functional location master as the Construction type.
(E) The same material BOM can be assigned to several equipment masters as the Construction type.
.

Question no : 720 PM Master Data BOM item data

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

Which of the following about BOM creation for Plant Maintenance is correct ?
(more than one answers)

(A) To create a material BOM, you can only use material BOM as a template.
(B) To create a equipment BOM, you can create with reference from a material BOM, or from a equipment BOM as a template.
(C) To create a BOM for a functional location, you can only use a functional location BOM or a Material BOM as a template.
(D) To create an equipment BOM, you can use material BOM, equipment BOM, or a Functional Location BOM as template.
(E) To create material BOM, you can use material BOM, equipment BOM as a template.
.

Question no : 719 PM Master Data BOM item data

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

Which of the following BOM items contain material master numbers ?
(more than one answers)

(A) Equipment BOM.
(B) Plant Maintenance BOM.
(C) Functional Location BOM.
(D) Material BOM.
(E) Document BOM.
.

Question no : 718 PM Master Data BOM Header

PLM305 Structuring and Managing Technical Objects
Unit 03 Bills of Material

Which of the following BOM header is a material master number ?
(more than one answers)

(A) Equipment BOM.
(B) Plant Maintenance BOM.
(C) Costing BOM.
(D) Material BOM.
(E) Production BOM.
.

Question no : 717 PM Master Data Equipment characteristics

PLM305 Structuring and Managing Technical Objects
Unit 02 Equipment

Which of the following statements are true about equipment?
(only one answers)

(A) An equipment can be installed in one or more functional locations at the same time.
(B) When an equipment is un-installed from the functional location; it must return to the warehouse as available stock.
(C) When an equipment is assigned a serial number, its material link must be similar to the construction type.
(D) Each equipment can have one or more sub-equipments assigned to it.
(E) The equipment and sub-equipment assignments are done in the equipment BOM.
.

Question no : 716 PM Master Data Equipment concepts

PLM305 Structuring and Managing Technical Objects
Unit 02 Equipment

Which of the following statements are true about equipment ?
(more than one answers)

(A) An equipment already created with an equipment category can be changed to another equipment category.
(B) An equipment category can have either internal or external number range assignment or both.
(C) An equipment category can only internal or external number range assignment.
(D) An equipment’s organization data can be inherited from a functional location or superior equipment.
(E) An equipment can only be installed as a sub-equipment only if the equipment category allows “superior equipment installation”.
.

Question no : 715 PM Master Data Classification for Technical Objects

PLM305 Structuring and Managing Technical Objects
Unit 02 Equipment

Which of the following statements are true about classification ?
(more than one answers)

(A) Each equipment or functional location can be assigned to several classes.
(B) The same class can be assigned to several class types.
(C) Class assignment to equipment or functional location is always mandatory.
(D) The same characteristics can be assigned to classes from different class types.
(E) Class characteristics are inherited upwards to superior classes.
.

Question no : 714 PM Master Data Technical Object Assignment

PLM305 Structuring and Managing Technical Objects
Unit 02 Equipment

An equipment cannot be assigned to a functional location when ?
(more than one answers)

(A) The equipment has been assigned as a sub-equipment to another equipment.
(B) The functional location already has an equipment installed and only one equipment is allowed installation at that functional location.
(C) If the equipment being assigned contains sub-equipments.
(D) If prior to the assignment, the equipment is already being issued maintenance notifications and maintenance orders.
(E) The equipment does not a class assigned to it.
.

Question no : 713 PM Master Data Installation of Technical Objects

PLM305 Structuring and Managing Technical Objects
Unit 02 Equipment

The following are pre-requisite for equipment installation to the functional location ?
(more than one answers)

(A) Equipment category must permit an installation.
(B) The Equipment category must have been set the “allow installation” indicator.
(C) The Functional location master record must have a permit.
(D) Functional Location master must allow equipment installation.
(E) The Equipment master record should not have a “deletion flag” status.
.

Question no : 712 PM Master Data Assignment of Technical Objects

PLM305 Structuring and Managing Technical Objects
Unit 02 Equipment

Which of the following you can assign to Functional Location or Equipment master ?
(more than one answers)

(A) Classification.
(B) Permits.
(C) Partner from Partner procedures.
(D) Documents from the Document Management System.
(E) Measuring Points and Counter.
.

Question no : 711 PM Master Data Change Documents

PLM305 Structuring and Managing Technical Objects
Unit 02 Equipment

In addition to change documents, it is also possible to display all changes for a particular view with old and new field contents in an _____________.
(only one answer)

(A) Administrative information.
(B) Change history.
(C) Change documents.
(D) Action log.
(E) Status log.
.

Question no : 710 PM Master Data Equipment Hierarchy

PLM305 Structuring and Managing Technical Objects
Unit 02 Equipment

Which of the following statements are true about equipment hierarchy ?
(more than one answers)

(A) assign equipments or materials to other equipment in a structure.
(B) assign equipments to other equipment in a structure.
(C) no configuration is required for equipment hierarchy creation.
(D) Only the uppermost piece of equipment may be installed to a functional location.
(E) All sub-equipments in the equipment hierarchy may be installed to functional locations.
.

Question no : 709 PM Master Data Fleet Object

PLM305 Structuring and Managing Technical Objects
Unit 02 Equipment

Fleet object:
(more than one answers)

(A) Cannot have an equipment heiarchy.
(B) Include only data relevant for core fleet functions
(C) Have a function to upload all costs from external vendors
(D) Can be a reference object for a notification or an order
(E) Have search help for common fleet identification fields
.

Question no : 708 PM Master Data Equipment Creation

PLM305 Structuring and Managing Technical Objects
Unit 02 Equipment

When creating equipment with a material template, you can:
(more than one answers)

(A) It copies the material number as a construction type to the new equipment.
(B) The accounting data of the material master is copied to the account assignment data content in the equipment master.
(C) Some of the dimension data content from the material master is copied over to the equipment master.
(D) It copies the material master as the material to the Serial Data folder in the equipment master.
(E) The Plant is copied from material as a maintenance plant in the equipment master.
.

Question no : 707 PM Master Data Equipment Scenario

PLM305 Structuring and Managing Technical Objects
Unit 02 Equipment

_________________ belong to the group of operating resources. These equipments are involved in the production process, or are used to check or restore size, structure, or efficiency. They are also used to support or to fulfill the prerequisites for performing a maintenance task. These equipment category also allows availability check based on the status of the equipment in the production process. Which equipment category is it referred to ?
(only one answer)

(A) Equipment.
(B) Fleet.
(C) Vehicle.
(D) Production Resources and Tools.
(E) Measuring and test equipment.
.

Question no : 706 PM Master Data Equipment Category

PLM305 Structuring and Managing Technical Objects
Unit 02 Equipment

To allow more detail structuring beyond equipment category; for example, cars, trucks for the fleet object equipment category; which data element is suggested ?
(only one answer)

(A) Classification.
(B) Object type.
(C) Structural indicator.
(D) Serial number.
(E) Split valuation.
.

Question no : 705 PM Master Data Equipment Category

PLM305 Structuring and Managing Technical Objects
Unit 02 Equipment

Which of the following is not a standard SAP PM Equipment Category ?
(only one answer)

(A) Equipment.
(B) Engine.
(C) Vehicle.
(D) Production Resources/tools.
(E) Test/Measuring Equipment.
.

Question no : 704 PM Master Data Technical Object Concepts

PLM305 Structuring and Managing Technical Objects
Unit 01 Functional Location

Which of the following statements is not correct ?
(more than one answers)

(A) You can link different master data views to different users, so each user can have the view they need.
(B) You can link the different views (tab pages) in the master records for technical objects (equipment and functional locations) to profiles. You assign these profiles to the individual technical object.
(C) Data view profiles are assigned to functional location category.
(D) Data view profiles are assigned to structural indicator.
(E) Irrespective of the data view profile, you can assign any description to all the tab pages of the view folders in the functional location master data.
.

Question no : 703 PM Master Data Alternate labels

PLM305 Structuring and Managing Technical Objects
Unit 01 Functional Location

Which of these are correct statements about alternative labels for functional locations ?
(more than one answers)

(A) If you change the number of a functional location, it is automatically repositioned in the appropriate hierarchy.
(B) You can use multiple labeling systems for the same hierarchy.
(C) Alternative labeling systems use an internal structure indicator to restructure the object.
(D) People can be given access to multiple vies of the same structure.
(E) Selecting the appropriate system is controlled with a user profile.
.

Question no : 702 PM Master Data Product Structure Browser

Product Structure Browser allows you to:
(more than one answers)

(A) Change the Equipment Master content.
(B) Change the BOM contents.
(C) Changing the superior functional location of a functional location.
(D) Create a new equipment and installing it to a functional location.
(E) Installing an equipment to a functional location.
.

Question no : 701 PM Master Data Functional Location Setup

PLM305 Structuring and Managing Technical Objects
Unit 02 Functional Location

When copying functional locations from another functional location, the following sub-objects can be copied from the source functional location:
(more than one answers)

(A) Long text.
(B) Classification.
(C) Document assignments.
(D) Measuring Points and Counters.
(E) Partner allocations.
.

Question no : 700 PM Master Data Reference Functional Location

As of SAP ECC6.0 Enhancement Package 3
PLM305 Structuring and Managing Technical Objects
Unit 02 Functional Location

Which of the following data elements are possible in the reference functional location ?
(more than one answers)

(A) Planning Plant.
(B) Maintenance Work Center.
(C) Equipment.
(D) Catalog Profile.
(E) Construction type.
.

Question no : 699 PM Master Data Structural Indicator

PLM305 Structuring and Managing Technical Objects
Unit 02 Functional Location

Which of the following are not true about the Structural Indicator ?
(more than one answers)
(A) Functional location and Reference functional location each has its own structural indicator configuration.
(B) Structural indicator is unique at the company level.
(C) Structural indicator is unique at the plant level.
(D) Structural indicator is assigned to the maintenance order type.
(E) You can use the same structural indicator for both functional location and reference functional location.
.

Question no : 698 PM Master Data Reference Functional Location

PLM305 Structuring and Managing Technical Objects
Unit 02 Functional Location

Reference functional location contain which of the following data elements:
(more than one answers)

(A) Cost center.
(B) Main work center.
(C) Planner group.
(D) Planning plant.
(E) Construction type.
.

Question no : 697 PM Master Data Equipment Installation

PLM305 Structuring and Managing Technical Objects
Unit 02 Functional Location

Which of the following can be assigned/installed to Equipment Master but not Functional Locations ?
(only one answer)

(A) Measuring Points.
(B) Construction type.
(C) Another Equipment Master.
(D) Material and Serial number.
(E) Classification.
.

Question no : 696 PM Master Data Action Log

PLM305 Structuring and Managing Technical Objects
Unit 02 Functional Location

The action log …..
(more than one answers)

(A) Identifies all orders for that object.
(B) Tracks the flow of all documents relating to a technical object.
(C) Indicates status changes to an object.
(D) Identifies who make the changes and when.
(E) Identifies which fields are “individually maintained” or “referenced”.
.

Monday, November 29, 2010

Question no : 695 PM Master Data Structural Indicator

PLM305 Structuring and Managing Technical Objects
Unit 01 Functional Location

Which of the following statements are true about the Structural Indicator ?
(only one answer)

(A) It is specific to a functional location category.
(B) It is plant specific.
(C) It can be differentiated for functional location and reference functional location.
(D) It is neither plant specific nor functional location category specific.
(E) It has a maximum hierarchy of 8 levels.
.

Thursday, November 25, 2010

Question no : 694 PM Reporting Material Where-used list

PLM300 Plant Maintenance
Unit 10 Reports and Analysis

The material where-used list provides the following information purpose ?
(more than one answers)

(A) to verify the use of materials in maintenance orders within a specific period of time.
(B) to display which materials are used in task lists.
(C) which materials were planned withdrawals (with reference to a reservation).
(D) to display which pieces of equipment that have been installed in chronological order.
(E) which materials were unplanned withdrawals (without reference to a reservation).
.

Question no : 692 PM Reporting Business Explorer

PLM300 Plant Maintenance
Unit 10 Reports and Analysis

Business Explorer:
(only one answer)

(A) Provides companies with flexible reporting and analysis tools for strategic analysis and to support the decision-making processes (for example, queries = enquiries/analysis).
(B) Refers to pre-configured role- and task-based information models based on consistent meta data It is the basis for providing a range of information for selected roles in a company which these roles need to perform their tasks.
(C) Is the meta data repository that stores the data dictionary of all SAP specific field contents which is the basis for info structures in PMIS.
(D) Uses the internet to deploy reports from PMIS for management decision making.
(E) Allows the extraction of data from diverse source systems to the SAP information structures.
.

Question no : 693 PM Reporting Equipment report

PLM300 Plant Maintenance
Unit 10 Reports and Analysis

Which of the following report displays all the pieces of equipment that have been installed in chronological order ?
(only one answer)

(A) Installation history.
(B) Action report.
(C) Usage list.
(D) Technical object list.
(E) Where-used list.
.

Question no : 691 PM Reporting Business Warehouse

PLM300 Plant Maintenance
Unit 10 Reports and Analysis

Which of the refers to pre-configured role- and task-based information models based on consistent meta data ? It is the basis for providing a range of information for selected roles in a company which these roles need to perform their tasks.
(more than one answers)

(A) Business Explorer.
(B) Business Meta data.
(C) Business Query.
(D) Business Content.
(E) Business Information Structure.
.

Question no : 690 PM Reporting PMIS concept

PLM300 Plant Maintenance
Unit 10 Reports and Analysis

Standard analysis tools provided for each information structure analysis in PMIS are ?
(more than one answers)

(A) ABC analysis.
(B) Correlation.
(C) Classification.
(D) Dual classification.
(E) Cumulative frequency curve.
.

Question no : 689 PM Reporting PMIS concept

PLM300 Plant Maintenance
Unit 10 Reports and Analysis

The following are standard info structures provided through Asset Life-Cycle Management ?
(more than one answers)

(A) Location and Planning.
(B) Damage Analysis.
(C) Object Statistics.
(D) Cost Evaluation.
(E) Work center capacity load.
.

Question no : 688 PM Reporting Info Structure concept

PLM300 Plant Maintenance
Unit 10 Reports and Analysis

Key elements mandatory for defining the info structure are ?
(more than one answers)

(A) Characteristics.
(B) Updating rules.
(C) Interface.
(D) Period unit.
(E) Key figures.
.

Question no : 687 PM Reporting PMIS concept

PLM300 Plant Maintenance
Unit 10 Reports and Analysis

The aim of PMIS is :
(more than one answers)

(A) To update is to condense the amount of data generated in the application into informative, meaningful characteristics and key figures.
(B) maintenance application data is updated online to the PMIS during its creation.
(C) Various analysis tools are provided to analyze the information collected in the standard info structures.
(D) You also have the option of creating your own info structures and your own analyses (flexible analyses).
(E) To view detail listings of all notifications and maintenance orders; as well as changing the notification and maintenance order data.
.

Question no : 686 PM Reporting Info Structure Characteristics

PLM300 Plant Maintenance
Unit 10 Reports and Analysis

Which of the following are characteristics in an info structure ?
(more than one answers)

(A) Maintenance work center, maintenance plant, planner group, equipment, maintenance quantity.
(B) Maintenance work center, maintenance plant, planner group, equipment, stocks.
(C) Maintenance work center, planning plant, maintenance plant, planner group, equipment, maintenance quantity, duration .
(D) Maintenance work center, maintenance plant, planner group, equipment, material.
(E) Maintenance work center, planning plant, maintenance plant, no of maintenance orders, planner group, PM cost.
.

Question no : 685 PM Reporting PMIS basics

PLM300 Plant Maintenance
Unit 10 Reports and Analysis

Standard Analysis in Plant Maintenance Information System (PMIS) provides:
(only one answer)

(A) Plant maintenance analysis on standard info structures provided by SAP.
(B) Tool for self defined info structures for Plant maintenance analysis.
(C) Reports of detail notification and maintenance order Listings.
(D) Tool to combine standard LIS structures from the Plant Maintenance Information System for Plant maintenance analysis.
(E) A report writer to extract data from the Plant maintenance database for Plant maintenance analysis.
.

Question no : 684 PM Reporting Material Where-Used List

PLM300 Plant Maintenance
Unit 10 Reports and Analysis

The material where-used list provides information about ?
(only one answer)

(A) material usage either planned or unplanned withdrawal from notification and maintenance orders.
(B) material usage for planned withdrawal from notification and maintenance orders.
(C) material usage for unplanned withdrawal only in from maintenance orders.
(D) material usage either planned or unplanned withdrawal from maintenance orders.
(E) material usage for planned withdrawal only from the maintenance orders.
.

Question no : 683 PM Reporting Usage List

PLM300 Plant Maintenance
Unit 10 Reports and Analysis

What information does the Usage List Report provides ?
(more than one answers)

(A) Object related and location based information about equipment usage.
(B) Phase of equipment installation history.
(C) Chronological order of equipment installed.
(D) Cost information of installation and dismantling.
(E) Maintenance orders executed for the installation and dismantling.
.

Question no : 682 PM Reporting PMIS

PLM300 Plant Maintenance
Unit 10 Reports and Analysis

The report tree structure for Plant Maintenance:
(more than one answers)

(A) Provides a list of all PM reports in a single location.
(B) Enables you to execute reports from any module.
(C) Allow you to call up both documentation and repots.
(D) Has cross application reports in the same structure as PM reports.
(E) Allow you to add new reports to the report tree structure.

Question no : 681 PM WCM Concepts

PLM300 Plant Maintenance
Unit 09 Work Clearance Management

Which of the following statements are not true about WCM application ?
(more than one answers)

(A) Connecting maintenance orders to WCM is not absolutely necessary.
(B) A minimum of one WCM document must be assigned to the maintenance order.
(C) Orders are linked to the WCM at the maintenance order header level.
(D) Orders are linked to the WCM at each maintenance order’s operations.
(E) Confirmation or task can be performed directly at the WCM level.
.

Question no : 680 PM WCM Concepts

PLM300 Plant Maintenance
Unit 09 Work Clearance Management

Maintenance task can be performed once the WCM- relevant orders has been released with status:
(only one answer)

(A) Released for Performance (PERF).
(B) Released for Cycle Start (STAT).
(C) Released (REL).
(D) Released for WCM (RWCM).
(E) Released for Execution (EXEC).
.

Question no : 679 PM WCM Concepts

PLM300 Plant Maintenance
Unit 09 Work Clearance Management

Which of the process step must be completed before the maintenance order managed with WCM can be technically completed ?
(only one answer)

(A) Un-tagging performed at Work Clearance Document.
(B) Un-tagging performed at Work Clearance Application.
(C) Un-tagging performed at Work Approval.
(D) Un-tagging performed at Work Clearance Document and Work Clearance Application.
(E) Un-tagging performed at Work Clearance Application and Work Approval.
.

Question no : 678 PM WCM Concepts

PLM300 Plant Maintenance
Unit 09 Work Clearance Management

Which of the following WCM related document specifies objects containing tagout/lockout details ?
(only one answer)

(A) Operational WCD.
(B) Work Clearance Application.
(C) Work Approval.
(D) Work Clearance Document.
(E) Operational Approval.
.

Question no : 677 PM WCM Concepts

PLM300 Plant Maintenance
Unit 09 Work Clearance Management

The difference between the Enhanced Model and Standard Model in WCM is ?
(only one answer)

(A) Operational WCD.
(B) Work Clearance Application.
(C) Work Approval.
(D) Work Clearance Document.
(E) Operational Approval.
.

Question no : 676 PM Project Based PM

PLM300 Plant Maintenance
Unit 08 Project Oriented Maintenance

When management maintenance using project based maintenance:
(more than one answers)

(A) it is necessary to use maintenance notification.
(B) it is not necessary to use maintenance notification.
(C) it is possible not to use project dates for scheduling the maintenance order.
(D) it is mandatory to use project dates for scheduling the maintenance order.
(E) it is not necessary to settle the maintenance order against a WBS element.
.

Question no : 675 PM Project Based Maintenance

PLM300 Plant Maintenance
Unit 08 Project Oriented Maintenance

The header of a project structure is:
(only one answer)

(A) Project leader.
(B) Maintenance order.
(C) Project header.
(D) WBS element.
(E) Project definition.
.

Question no : 674 PM Project Based Maintenance

PLM300 Plant Maintenance
Unit 08 Project Oriented Maintenance

For Project based maintenance, components procured are to be received into which type of special stocks ?
(only one answer)

(A) WBS element.
(B) Project definition.
(C) Sales order.
(D) Maintenance order.
(E) Common stock .
.

Question no : 672 PM Project Based Maintenance

PLM300 Plant Maintenance
Unit 08 Project Oriented Maintenance

Which of the following scenarios are possible project-oriented maintenance ?
(more than one answers)

(A) Make to Order Production.
(B) R&D Projects.
(C) Investment Projects.
(D) Maintenance for Utilities industry.
(E) Shut down Projects.
.

Question no : 673 PM Project Based Maintenance

PLM300 Plant Maintenance
Unit 08 Project Oriented Maintenance

The WBS element controls the maintenance order with regards to which of the following ?
(more than one answers)

(A) Material components that is assignable to the maintenance order.
(B) Basic dates used for scheduling the maintenance order.
(C) Document assignment.
(D) Budget control.
(E) Task list.
.

Question no : 671 PM Project Based Maintenance

PLM300 Plant Maintenance
Unit 08 Project Oriented Maintenance

In Project based maintenance, maintenance orders are assigned to:
(only one answer)

(A) Project Definition.
(B) Activities.
(C) Work.
(D) Work Breakdown Structure.
(E) Planning Board.
.

Question no : 670 PM Preventive Single-Cycle Concepts

PLM300 Plant Maintenance
Unit 07 Preventive Maintenance

The simplest single cycle maintenance plan can be created:
(more than one answers)

(A) Without any reference object (equipment, functional location, assembly).
(B) Without task list.
(C) Without cycle/unit.
(D) Without planning data (planning plant, order type, main work center, …)
(E) Without counters.
.

Question no : 658 PM Preventive Strategy Concepts

PLM300 Plant Maintenance
Unit 07 Preventive Maintenance

An equipment is to be serviced every 3 months, the service performed is characterized by one maintenance operation in the task list, which of the following preventive maintenance method is recommended ?
(only one answer)

(A) Single Cycle Plan.
(B) Quarterly Cycle Plan.
(C) Time Based Strategy Plan.
(D) Single Operation Plan.
(E) Fixed Time Maintenance Plan.
.

Question no : 659 PM Preventive Performance based concepts

PLM300 Plant Maintenance
Unit 07 Preventive Maintenance

Preventive maintenance tasks are due when a condition is outside a specific range. For example, the temperature is higher than 90 degree Celsius; which preventive maintenance types is most suitable ?
(only one answer)

(A) Time-based.
(B) Performance-based.
(C) Condition-based.
(D) Tolerance-based.
(E) Limit-based.
.

Question no : 657 PM Preventive Strategy Concept

PLM300 Plant Maintenance
Unit 07 Preventive Maintenance

Which of the following statements are True ?
(more than one answers)

(A) Time-based Preventive Maintenance plans are triggered after a specific period of time has elapsed.
(B) Maintenance Task Lists can be used to standardize recurring activities.
(C) The packages for a strategy can have difference cycle units, such as month, year, but they must always have the same dimension, such as time.
(D) Maintenance item consists of planning data, reference objects, and task lists.
(E) Planned dates define the date from which the calculation of the cycle date begins.
.

Question no : 656 PM Preventive Maintenance Plan Concepts

PLM300 Plant Maintenance
Unit 07 Preventive Maintenance

Which of the following object assignments are correct ?
(more than one answers)

(A) only one maintenance item can be assigned to the maintenance plan.
(B) more than one maintenance items can be assigned to the maintenance plan.
(C) only one maintenance strategy can be assigned to the task list.
(D) more than one maintenance strategy can be assigned to the task list.
(E) every operations in the task list must have a maintenance package.
.

Question no : 656 PM Preventive Strategy Plan Concepts

PLM300 Plant Maintenance
Unit 07 Preventive Maintenance

To implement strategy based preventive maintenance, the following setups are mandatory ?
(more than one answers)

(A) A strategy must be defined in the task list header.
(B) A strategy must be defined in the operations.
(C) A strategy must be defined in the maintenance plan.
(D) A maintenance package must be defined in the task list header.
(E) A maintenance package must be defined in the maintenance plan.
.

Question no : 655 PM Preventive Maintenance Package

PLM300 Plant Maintenance
Unit 07 Preventive Maintenance

The important parameters for a maintenance package are:
(more than one answers)

(A) Cycle length.
(B) Hierarchy.
(C) Preliminary buffer.
(D) Follow-up buffer.
(E) Unit of measure.
.

Question no : 654 PM Preventive Strategy Hierarchy

PLM300 Plant Maintenance
Unit 07 Preventive Maintenance

The purpose of the hierarchy levels that are assigned to each maintenance package:
(only one answer)

(A) If maintenance packages have different hierarchy levels, the maintenance package with the higher is not executed.
(B) If maintenance packages have different hierarchy levels, the maintenance package with the lower level is not executed.
(C) If maintenance packages have the same hierarchy levels, none of the maintenance package are executed.
(D) If maintenance packages have the same hierarchy levels, the maintenance package with the earliest creation date is executed.
(E) If maintenance packages have the same hierarchy levels, the maintenance package with the latest creation date is executed.
.

Wednesday, November 24, 2010

Question no : 653 PM Preventive Date Calculation

PLM300 Plant Maintenance
Unit 07 Preventive Maintenance

The dates from which the calculation of the planned dated should begin is defined by:
(only one answer)

(A) Schedule start date.
(B) Planned date.
(C) Call date.
(D) Cycle start.
(E) Basic start.
.

Question no : 652 PM Preventive Single-Cycle Plan Concepts

PLM300 Plant Maintenance
Unit 07 Preventive Maintenance

Which of the following are characteristics of a single cycle plan ?
(more than one answers)

(A) Tasks list assignment is optional in the maintenance plan.
(B) The maintenance plan can have only one maintenance item.
(C) Different cycle units are allowed with the same dimensions.
(D) Multiple maintenance items are allowed but all must be assigned to the same maintenance tasks list.
(E) Multiple maintenance items are allowed and each can be assigned to its corresponding tasks list different from each other.
.

Question no : 651 PM Preventive Strategy Concepts

PLM300 Plant Maintenance
Unit 07 Preventive Maintenance

The following relationships and assignments are True ?
(more than one answers)

(A) Maintenance task lists are assigned to the maintenance plan.
(B) Maintenance packages are assigned to the individual operations in the tasks list.
(C) Maintenance strategy contains maintenance packages.
(D) Strategy based Maintenance plan are assigned maintenance strategy.
(E) Tasks list assignment is optional in the maintenance plan.
.

Question no : 650 PM Preventive Task List Basic concepts

PLM300 Plant Maintenance
Unit 07 Preventive Maintenance

Which of the following are True for Task Lists ?
(more than one answers)

(A) The operation overview screen shows most fields from operational detail screen.
(B) Internal data can be determined on the operation overview screen. You only need to go to other screens to process external data.
(C) You can assign maintenance packages to operations on the operation overview screen.
(D) Internal service specifications are configurable.
(E) The material where-used list will identify all tasks to which a specific material is assigned as part of a material BOM.
.

Question no : 649 PM Preventive Task List Header

PLM300 Plant Maintenance
Unit 07 Preventive Maintenance

Which of the following objects can be assigned to the task list header ?
(more than one answers)

(A) Planner group.
(B) Maintenance strategy.
(C) Task List Group number and Group counter.
(D) Production Resource Tool.
(E) Work Center.
.

Question no : 648 PM Preventive Task List Concepts

PLM300 Plant Maintenance
Unit 07 Preventive Maintenance

Tasks list are created for the following reasons:
(more than one answers)

(A) Preventive maintenance.
(B) Inspection.
(C) Calibration.
(D) Routine maintenance.
(E) Refurbishment.
.

Question no : 647 PM Preventive Strategy Concepts

PLM300 Plant Maintenance
Unit 07 Preventive Maintenance

The object used to define the operational steps required for preventive maintenance are defined by:
(only one answer)

(A) Operation list.
(B) Maintenance plan.
(C) Maintenance order’s operational overview.
(D) Service list.
(E) Tasks list.
.

Question no : 646 PM Preventive Basic Concepts

PLM300 Plant Maintenance
Unit 07 Preventive Maintenance

Which of the following are Preventive Maintenance types supported by SAP Plant Maintenance ?
(more than one answers)

(A) Caused-based.
(B) Time-based.
(C) Status-based.
(D) Performance-based.
(E) Condition-based.
.

Question no : 645 PM Order Refurbishments

PLM300 Plant Maintenance
Unit 06 Refurbishment of Spare Parts

The following processes in Refurbishment scenario is True ?
(more than one answers)

(A) Creation of Refurbishment order from notification is not supported.
(B) A material number is a required entry in the refurbishment order entry.
(C) The material with valuation type to be refurbished from will automatically be created as component goods issue in the component folder of the refurbishment order.
(D) The material with valuation type to be refurbished from will automatically be created as component goods issue and the material with valuation type to be refurbished “to” will be created as component goods receipt in the component folder of the refurbishment order.
(E) It is not possible to enter Equipment and Functional Location in the standard refurbishment order.
.

Question no : 644 PM Order Refurbishment Scenario

PLM300 Plant Maintenance
Unit 06 Refurbishment of Spare Parts

This question uses the data sheet from Question 9. Assume the same refurbishment scenario. What are the stock value and accounting postings after settlement ?
(more than one answers)

(A) Total stock value will be at $ 24700
(B) Total stock value will be at $ 25200
(C) Total moving average price will be at $ 617.50
(D) Total moving average price will be at $ 630.00
(E) C2 with 11 units at stock value of $ 10200.
.

Question no : 643 PM Order Refurbishment Concept

PLM300 Plant Maintenance
Unit 06 Refurbishment of Spare Parts

What are the stock value during processing of the refurbishment order of Actual condition C3 to Target condition C2 ?

Price control at the valuation area level is “V” with a MAP (Moving average price of 500). The total replacement costs is measured at $ 200.

Stock value before processing.            
Condition
Price
Quantity
Stock value
Price control
C1
500
10
$ 5000
“V”
C2
1000
10
$ 10000
“V”
C3
500
20
$ 10000
“V”
$ 25000
Total value
 $ 625
Per unit

(more than one answers)

(A)   C3 with 19 units at stock value of $ 9500.
(B)   C3 with 19 units at stock value of $ 9200.
(C)   C2 with 11 units at stock value of $ 11000.
(D)   C2 with 11 units at stock value of $ 10200.
(E)   C2 with 11 units at stock value of $ 10300.
.

Question no : 642 PM Order Refurbishment Concept

PLM300 Plant Maintenance
Unit 06 Refurbishment of Spare Parts

This question uses the data sheet from Question 7. Assume the same refurbishment scenario. What are the stock value and accounting postings after settlement ?
(more than one answers)

(A) C3 with 19 units at stock value of $ 9600.
(B) C2 with 11 units at stock value of $ 20400.
(C) C2 with 11 units at stock value of $ 21600.
(D) C2 with 11 units at stock value of $ 22000.
(E) $1600 is posted as price difference account.
.

Question no : 641 PM Refurbishment Concept

PLM300 Plant Maintenance
Unit 06 Refurbishment of Spare Parts

What are the stock value during processing of the refurbishment order of Actual condition C3 to Target condition C2 ?

Price control at the valuation area level is “V” with a MAP (Moving average price of 800). The total replacement costs is measured at $ 400.

Stock value before processing.            
Condition
Price
Quantity
Stock value
Price control
C1
1000
10
$ 10000
“S”
C2
2000
10
$ 20000
“S”
C3
500
20
$ 10000
“S”
$ 40000
Total value
 $ 800
Per unit

(more than one answers)

(A)  C3 with 19 units at stock value of $ 9500.
(B)  C3 with 19 units at stock value of $ 9200.
(C)  C2 with 11 units at stock value of $ 22000.
(D)  C2 with 11 units at stock value of $ 20800.
(E)   C2 with 11 units at stock value of $ 20400.
.

Question no : 639 PM Order Refurbishment Concept

PLM300 Plant Maintenance
Unit 06 Refurbishment of Spare Parts

What is the price control allowed at the valuation area level of the material where the valuation category is assigned ?
(only one answer)

(A) Standard Price only.
(B) Moving Average Price only.
(C) Either Moving Average Price or Standard Price.
(D) Moving Average Price if all valuation type accounting views are of Moving Average Price.
(E) Standard Price if all valuation type accounting views are of Standard Price.
.

Question no : 640 PM Order Refurbishment Concept

PLM300 Plant Maintenance
Unit 06 Refurbishment of Spare Parts

When entering a refurbishment order, you have to enter the following data:
(more than one answers)

(A) Material number to be refurbished.
(B) Quantity to be refurbished.
(C) Actual condition to be refurbished. (current valuation type)
(D) Target condition to be achieved. (desired valuation type)
(E) G/L account to be posted.
.

Question no : 638 PM Order Refurbishment Concept

PLM300 Plant Maintenance
Unit 06 Refurbishment of Spare Parts

Materials setup for valuation type will have the valuation category assigned at the valuation area of the material; what is true about the data for split valuation at the valuation area ?
(more than one answers)

(A) Overall stocks of all valuation types are always updated at the valuation area.
(B) Price control at the valuation area must always be of “V” or Moving average price regardless of the price control for the valuation types.
(C) Price control at the valuation area can be either “V” for Moving average or “S” for Standard Price.
(D) The moving average price, stocks value, and total stock quantity at the valuation area are for statistical purpose only.
(E) The moving average price at the valuation area are used for inventory valuation of the valuation types.
.

Question no : 637 PM Order Refurbishment Concept

PLM300 Plant Maintenance
Unit 06 Refurbishment of Spare Parts

Which of the following objects can be refurbished ?
(more than one answers)

(A) Material without serial number.
(B) Material with serial number.
(C) Material with batch number.
(D) Material without the accounting view.
(E) Material without batch number.
.

Question no : 636 PM Order Refurbishment Concept

PLM300 Plant Maintenance
Unit 06 Refurbishment of Spare Parts

Valuation type is an integral part of the refurbishment process master data definition, valuation type provides the following setup features ?
(more than one answers)

(A) Allows different price controls for each valuation type.
(B) Allows different prices for each valuation type regardless of its price control.
(C) Allows different prices for each valuation type as long as the price control is different.
(D) Allows control of posting to separate G/L accounts.
(E) Allows different movement types for each valuation type.
.

Question no : 635 PM Order Refurbishment Concept

PLM300 Plant Maintenance
Unit 06 Refurbishment of Spare Parts

What are the steps in the refurbishment process ?
(more than one answers)

(A) Create a special refurbishment order with a “from” and “to” status of the valuation types.
(B) Withdraw the defective material from the warehouse with a goods issue.
(C) Return the repaired material by reversing the goods issue.
(D) Define a settlement profile with material as the default account assignment.
(E) Create a internal stock transfer order to transfer the stocks from the PM system to the MM system.
.

Question no : 634 PM Order Corrective Scenario Concept

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Which of the following is true about the Object List in the Maintenance order ?
(more than one answers)

(A) You can assign a mixture of technical objects in a single maintenance order.
(B) You can assign only one type of technical objects in a single maintenance order.
(C) You can create an individual notification for each technical object in the object list.
(D) You can assign or define any of the notification in the object list in the maintenance order as the notification header.
(E) When the maintenance order header already has a notification as the notification header, it cannot be re-assigned with other notifications in the object list of the maintenance order.
.

Question no : 633 PM Order Cancel confirmation

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

When you “Cancell” a confirmation:
(more than one answers)

(A) You can partially cancel the confirmation results.
(B) The entire confirmation result is cancelled.
(C) The status at the operation level is reversed.
(D) You are asked to key in a canceling reason.
(E) A new confirmation number is generated.
.

Question no : 632 PM Execution AV Check

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Material availability check requires which of the following setup ?
(only one answer)

(A) Material master AV check group and Order type AV check rule.
(B) Material master AV check rule Order type AV check group.
(C) Material master AV check rule and Order Category AV check rule.
(D) Material master AV check group and Order Category AV check rule.
(E) Material master AV check rule and Order Category AV check group.
.

Question no : 631 PM Order Costing Value Category

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Costing results shown as value category in the maintenance order are:
(only one answer)

(A) Grouping of costs based on value categories.
(B) Grouping of costs from a group of cost centers assigned to the various object types in the maintenance order.
(C) Grouping of costs based on material type of components and control key of operations.
(D) Grouping of costs based on object type in the maintenance order.
(E) Grouping of costs from a group of costs elements.
.

Question no : 630 PM Execution Central Address Management

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Central Address Management’s address records can be accessed and copied into:
(only one answer)

(A) Order Header specific address.
(B) Partners specific address.
(C) "PM01" Control Key Operations specific address.
(D) Certain Components specific address.
(E) All Technical Objects specific address. in the Objects list.
.

Question no : 629 PM Execution Document Flow

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Document Flow List provides the following information on a maintenance order:
(more than one answers)

(A) Confirmation results.
(B) Unplanned goods issue results.
(C) Planned goods issue results.
(D) Status of Operations.
(E) Status of Order.
.

Question no : 628 PM Execution Order Delta Printing

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

A Delta print will:
(only one answer)

(A) Print all shop papers not yet printed for a maintenance order.
(B) Print operations and components in separate shop papers.
(C) Print each operations in the maintenance order separately.
(D) Print components not yet withdraw from stock.
(E) Print remaining operations which is not confirmed yet.
.

Question no : 627 PM Execution Order Release Functions

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

You are able to release maintenance orders via which of the following methods ?
(more than one answers)

(A) Within the maintenance order.
(B) Operation List.
(C) Order and Operation List.
(D) Order List.
(E) Material Where-used list.
.

Question no : 626 PM Execution Order Confirmation Functions

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Which of the following List Display reports allow you to confirm operations ?
(only one answer)

(A) Order and Operation List.
(B) Operation List.
(C) Component List.
(D) Order List.
(E) Order and Operation List.
.

Question no : 625 PM Execution Order Planned/Unplanned GI

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Which of the following report best describes planned and unplanned goods issue for the maintenance order ?
(only one answer)

(A) Order Flow.
(B) Order List Multi-level.
(C) Component List.
(D) Material Where-used list.
(E) Time ticket Confirmation.
.

Question no : 624 PM Execution Order External Service Work Center

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Which of the following are characteristics of external services procurement scenario using work center to represent the external company ?
(more than one answers)

(A) A Blanket Purchase Order is to be created with validity dates.
(B) The cost center must have been assigned to the blanket PO.
(C) The costs of the services are recorded in the activity prices.
(D) Shop papers from maintenance order are send to the external company.
(E) Periodic invoicing will debit the cost center.
.

Question no : 622 PM Execution Order Control Key PM03

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Control key PM03 supports which type of Procurement scenario ?
(only one answer)

(A) External procurement for stocks item.
(B) External procurement for non-stock item.
(C) External services procurement for external company as work center.
(D) External services procurement for individual purchase order.
(E) External services procurement for service items/specifications.
.

Question no : 623 PM Execution Order External Service Concepts

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Which method is used to record services completed by external services procurement scenario via service specifications ?
(only one answer)

(A) Confirmations.
(B) Service entry sheets.
(C) Goods receipt.
(D) Service confirmations.
(E) Collective invoice verifications.
.

Question no : 621 PM Execution Change Histories

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Which of the following object displays in chronological order any changes made to the notifications, orders, equipments, and functional locations.
(only one answer)

(A) Action log.
(B) Change log.
(C) Object list.
(D) Active list.
(E) Activity log.
.

Question no : 620 PM Execution Confirmation Process

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Which of the following statements are True regarding the confirmation process ?
(more than one answers)

(A) For Order confirmation to complete the order and notification together, there must not be any outstanding tasks in the notification.
(B) Technically complete (TECO) status cannot be reversed.
(C) At TECO status, all open purchase requisitions are closed.
(D) Technically complete cannot be set if there are open purchase requisitions and open reservations.
(E) Technically complete can be set even if there are open purchase requisitions and open reservations.
.

Question no : 619 PM Execution Confirmation

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

During the confirmation process, the following are possible:
(more than one answers)

(A) Actual maintenance time used is entered.
(B) Technical findings such as damage, case of damage, or repairs performed.
(C) Perform material withdrawal.
(D) Perform material backflush.
(E) Record who has performed the maintenance operation.
.

Question no : 618 PM Execution Order Status "Business Completion"

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Setting the Maintenance order with status “Business Completion” generally means the following:
(more than one answers)

(A) All costs have already been posted.
(B) The Maintenance order has been archived.
(C) The order has been settled by Controlling.
(D) Further time confirmations are not allowed.
(E) Maintenance order is now in display mode only.
.

Question no : 617 PM Execution Order Shop Paper setups

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Which of the following Shop Papers printing depends on the Control Key assigned to the operation in the maintenance order ?
(more than one answers)

(A) Material withdrawal slip.
(B) Job Ticket.
(C) Control Ticket.
(D) Confirmation Slip.
(E) Time Ticket.
.

Question no : 616 PM Execution Order Shop Paper features

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Which of the following Shop Papers provides the employee responsible in Plant Maintenance with a complete overview of the order. It also contains details of permits ?
(only one answer)

(A) Operation List.
(B) Time ticket.
(C) Operation control ticket.
(D) Job ticket.
(E) Control ticket.
.

Question no : 615 PM Execution Order Costing Analysis

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

When analyzing Maintenance order costing; cost analysis can be displayed using cost element and value category, what is the relationship of these 2 types of cost analysis report ?
(more than one answers)

(A) Groups of cost elements are used to specify or assigned to the value categories.
(B) Value category analysis is a summary report while Cost element report is a more detail report.
(C) Value category analysis is accessible in PM while Cost element report analysis is accessible in CO.
(D) Groups of value categories are used to specify or assigned to the cost element.
(E) Cost Element analysis report contains the Actual costs posted to the maintenance order while Value category analysis report will show both the planned and actual costs posted to the maintenance order.
.

Question no : 614 PM Execution Order Central Address Management

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Central address management can be connected to which of the following objects:
(more than one answers)

(A) Equipment.
(B) Functional Location.
(C) Maintenance Notification.
(D) Component for non-stock materials in the Maintenance Order.
(E) Maintenance Order.
.

Question no : 613 PM Execution Order Web Catalog

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

When Catalog are access through the EBP (Enterprise Buyer Professional) for material planning in the maintenance order; the following are the pre-requisites required:
(more than one answers)

(A) EBP system customizing must be setup in the R/3 back-end system.
(B) Maintenance order is first created in the R/3 system and accessed by the EBP system for procurement planning.
(C) An External or Internal catalog must be available to the EBP system.
(D) The component selected for procurement through EBP can either be a non-stock item or a stock item.
(E) The Maintenance order is created in the EBP system, procurement planning completed through external catalogs and the saved maintenance order is transferred to the R/3 system.
.

Question no : 612 PM Execution Order Non-Stock Scenarios

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

When a non-stock material is created in the maintenance order, which of the statements do not correctly depict its functionality :
(more than one answers)

(A) A purchase requisition is always automatically generated.
(B) A purchase order can be created manually in the maintenance order.
(C) Goods receipt can only be entered with reference to the purchase order after the order has been put in process.
(D) Goods receipt can be entered with reference to the purchase order before or after the order has been put in process.
(E) Invoice verification of the purchase order will never affect the costs of the original purchase order value posted as it is integrated from materials management to accounts payable.
.

Question no : 611 PM Execution Order Purchasing Requisition Controls

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Purchase requisition can be controlled either to be generated when the order is saved or released via which of the following data object in the maintenance order ?
(only one answer)

(A) Control Key.
(B) Order Type.
(C) Procurement Key.
(D) Procurement Type.
(E) Release Strategy.
.

Question no : 610 PM Execution Order Object List

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

The Object List is an integral part of the maintenance order, which of the following statements are correct about the Object List.
(more than one answers)

(A) The objects you that you may enter in the Object List must have been entered in the maintenance header data screen.
(B) A maintenance order may have only one notification assigned in the Object List BUT multiple equipments are possible in the Object List.
(C) The types of objects you may enter in the Object List does depends on the choice of reference object for the maintenance order.
(D) The Object List “controls” the order in that work done is distributed amongst the objects assigned as well as fair distribution of costs between the objects.
(E) Notifications already assigned in the Object Lists can be separated or dis-located from the maintenance order.
.

Question no : 609 PM Execution Order Fast Entry

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

For a fast entry of a simple corrective maintenance order with a single operation, which of the following data entry choice is best suited.
(only one answer)

(A) You can enter the operation data in the header data screen and confirm the single operation in the operation overview screen.

(B) You can enter the operation data in the header data screen and proceed to the operational detail screen to enter the Control Key before saving.

(C) You can enter the operation data in the header data screen without having to use any further screens.

(D) You must enter the operation data in the operation overview screen without having to use any further screens.

(E) You can enter the operation data in the reference object view in the initial maintenance order screen to default to the operation overview screen to save a data entry step.
.

Question no : 608 PM Execution Order Release

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

When the maintenance order is released:
(more than one answers)

(A) Material reservations are created.
(B) Material withdrawal is now allowed.
(C) Material availability check may be automatically performed by the system.
(D) Additional materials cannot be inserted to the maintenance order.
(E) Materials other than specified in the maintenance order cannot be withdraw for the maintenance order.
.

Question no : 607 PM Execution Order Reference Object View

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

The reference object view in the initial screen for creating a maintenance order, in the standard system; the following view versions are available:
(more than one answers)

(A) Function location, equipment and assembly.
(B) Material number and serial number.
(C) Equipment.
(D) Without reference object.
(E) Task List
..

Question no : 606 PM Execution Order Scenario

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Which of the following Maintenance Order Scenario is supported by SAP Plant Maintenance ?
(more than one answers)

(A) A responsible planner detects damage of a piece of equipment personally. The planner creates the order required for repair work and simultaneously also creates a notification for the order.

(B) An aircraft needs to be repaired. It is assigned to planning plant 1000 in its master records. However, the aircraft has to be repaired in plant 1200. The planner can therefore enter the deviating planning plant 1200 in the maintenance order for the aircraft.

(C) Environmental protection and manufacturer regulations require that a production plant is maintained at regular intervals. Therefore, the responsible planner creates a maintenance plan, which contains the required work in the form of a task list. Based on the maintenance schedule defined, the system now automatically can generates an order for preventive maintenance of the production plant at regular intervals.

(D) The responsible planner checks the newly created notifications outstanding in the system. A maintenance task must be planned and performed immediately for one of the notifications. The planner therefore creates an order directly from the notification selected in the change mode.

(E) An employee discovers some damage of a piece of equipment when a planner is present. The planner does not enter a malfunction report in the system. But instead immediately creates an order to plan the repair. 
.

Question no : 605 PM Execution Order Auto Generate

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Which of the following functions automatically generates a maintenance order ?
(only one answer)

(A) Notification.
(B) Maintenance Plan.
(C) Maintenance Task List.
(D) Reburbishment Plan.
(E) Activity Report.
.

Question no : 604 PM Execution Order External Processing

As of ECC6.0
PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Which are the 3 ways of representing external processing in the Maintenance order ?
(more than one answers)

(A) Processing with an external company as work center.
(B) Processing with MM Purchase Order processing and goods receipt.
(C) Processing with service specifications.
(D) Processing with an external production order.
(E) Processing with service orders.
.

Question no : 603 PM Execution Order Costing Concept

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Information regard which CO object should bear the maintenance costs is stored in which data element in the Maintenance Order ?
(only one answer)

(A) Cost segment.
(B) Profitability segment.
(C) Object List.
(D) Cost center.
(E) Settlement rule.
.

Question no : 602 PM Execution Order Object Services

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Object service is a function that:
(more than one answers)

(A) Enables you to send a mail to any SAP user or distribution list.
(B) Enables the user to branch directly to the relevant transaction.
(C) Enables automatic response to mails sent using this function.
(D) Is only available for technical objects, notifications, and orders.
(E) Is available for technical objects, notifications, orders, task list, maintenance plans, and work centers.
.

Question no : 601 PM Execution Order Reporting

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

The List editing function has been converted to ABAP list viewer. This means that.
(more than one answers)

(A) You can shift columns.
(B) You can insert new headings into lists.
(C) You can sort by several fields simultaneously.
(D) You can combine several notifications and orders into a single list.
(E) You can display drawings in the lists.

Question no : 600 PM Execution Notification Catalog Profile

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

What is the purpose of the catalog profile used for notification ?
(more than one answers)

(A) So that only codes in the code groups relevant for the object are displayed for selection.
(B) So that all codes within a catalog assigned to the catalog profile are displayed for selection.
(C) So that the relevant codes selected can be used as a starting point for workflows and its follow up actions.
(D) So that recoded codes can be analyzed in the standard analysis within the PMIS.
(E) So that documents from the DMS (Document management system) can be assigned to the tasks, activities, and causes for documenting the malfunction history.
.

Question no : 599PM Execution Notification Object Info

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

The Object information in the Notification provides the following facilities ?
(more than one answers)

(A) Allow the user to call up information about orders and maintenance items.
(B) Allow the user to check spare parts stocks availability.
(C) Allow the user to call up other notifications and close them so as the new notification being created can proceed.
(D) Would automatically be displayed without user request if certain conditions are fulfilled when entering a new notification.
(E) Allow the user to view statistics of maintenance notification related to the object currently entered in the new notification.
.

Question no : 598PM Execution Notification-Order Integration

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

A Notification of Malfunction can be entered with the following scenario.
(more than one answers)

(A) Without any notification objects.
(B) With a functional location but without an assembly.
(C) With a functional location and an assembly.
(D) With an assembly but without a functional location.
(E) With a functional location, equipment, and an assembly.
.

Question no : 597PM Execution Notification Concepts

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

Where would you recommend to record the short term activities implemented to resolve the notification of malfunction within the notification record ?
(only one answer)

(A) Notification item Activities
(B) Notification header Activities
(C) Notification item Tasks
(D) Notification header Tasks
(E) Notification header Immediate Tasks
.

Question no : 596PM Execution Notification Items

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

A Notification can have several Notification items, each notification item can have the following records.
(more than one answers)

(A) Activities
(B) Tasks
(C) Partners
(D) Immediate Tasks
(E) Causes
.

Question no : 595 PM Execution Order Concepts

PLM300 Plant Maintenance
Unit 05 Corrective Maintenance

The Decisions of type of work to be performed and resources/tools required are usually carried out in which step of the Corrective Maintenance Process ?
(only one answer)

(A) Notification.
(B) Planning.
(C) Scheduling.
(D) Execution.
(E) Completion.
.

Question no : 594 PM Execution Order Put in Process

PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance

A maintenance order can be put in process, which of the following are the results of this processing step ?
(more than one answers)

(A) The maintenance order shop papers are not printed automatically.
(B) The maintenance order shop papers are printed automatically.
(C) The maintenance order is released.
(D) The maintenance order is costed and saved.
(E) The maintenance order is settled.
.

Question no : 593 PM Execution Order TECO

PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance

At technical complete of the maintenance order, which data is transferred from the maintenance order to the notification ?
(only one answer)

(A) Malfunction start date.
(B) Malfunction end date.
(C) Cause code.
(D) Damage code.
(E) Activities.
.

Question no : 592 PM Execution Order Breakdown Concepts

PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance

In General, the minimum data requirement for the maintenance order creation is:
(more than one answers)

(A) Maintenance order type.
(B) A technical object.
(C) Priority.
(D) Short text.
(E) Spare parts.
.

Question no : 591 PM Execution Order Breakdown Processing Options

PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance

Which of the following processing options are possible the for Breakdown Maintenance scenario ?
(more than one answers)

(A) Completing the notification while technically completing the maintenance order.
(B) Completing the notification separately from the technical completion of the maintenance order.
(C) Partially confirmation of the notification.
(D) Partially confirmation of the maintenance order.
(E) Partially confirmation of the maintenance order’s operations.
.

Question no : 590 PM Execution Order Confirmation Options

PLM300 Plant Maintenance
Unit 04 Breakdown Maintenance

Which confirmation options are available for Breakdown maintenance execution and completion ?
(more than one answers)

(A) Individual entry.
(B) Collective entry.
(C) Collective entry using operation list.
(D) Overall completion confirmation.
(E) Progress confirmation.
.