Question no 2492 : MRP Pre-quisites

In SAP MRP Planning, the following are valid pre-requisites for MRP run EXCEPT ?

(only one answer)

A)    Activate MRP for the Plant in the IMG.
B)    Planning file entry for the material master of the Plant.
C)    Not blocked from MRP run via the Material Status.
D)    Checking Group in the MRP 3 data view for Availability Check.
E)    MRP Plant Parameter.