This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Tuesday, July 15, 2014

Question no 2454 : Inspection Point assignment

In SAP QM ECC6.0, you can assign Inspection Point to which of the following ?

(more than one answers)

A)   Material Master QM view inspection type detail.
B)   Quality Info Record Inspection Control folder.
C)   Inspection Plan Header.
D)   Production Routing Operation detail.
E)   Maintenance Task List Header.
.



2 comments:

  1. You can assign Inspection Point in the follwoing manner:
    . Inspectiin Plan Header (which can be used for various scenarios like GR for PO)
    . Production Routing Heaser (for PP In-Process Inspection)
    . Recipe Header (for PI In-Process Inspection)
    . Maintenance Task List (for Equipment Calibration)

    ReplyDelete

Note: Only a member of this blog may post a comment.