In SAP PP MRP, which of the following statements are TRUE about MRP run ?

(more than one answers)

A)    MRP run with 'Lead time scheduling' will terminate when Routing was not found.
B)    MRP run with 'Lead time scheduling' will refer to data in the Work Scheduling data view when Routing was not found.
C)    In-house production time and lot-size dependent data in the work scheduling data view are mutually exclusive.
D)    You can use a program to calculate proceesing time from the Routing and update both the in-house production time or lot-size dependent data in the work scheduling data view.
E)    If the lot-size dependent data in the work scheduling data view is referenced to the Routing, it must be un-locked before changes can be made.
.

3 comments:

  1. A, B) MRP run using 'Lead time scheduling' will search for a Routing but if a Routing cannot be located, it will then use the data from the Work Scheduling data view.

    ReplyDelete
  2. C, D, E) You can use CA97 to calculate the lead times from the Routing and later use CA96 to update the material master. These programs only updates the lot-size dependent data in the work scheduling view. There are no reference nor locking of the Routing to the lot-size dependent data int he work schedulung data view. In-house production time is lot size independent and always manually entered. The in-house production time and the lot-size dependent data are mutually exclusive.

    ReplyDelete