This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Tuesday, April 30, 2013

Question no 1898 : Plant Maintenance Order Category

In SAP PM ECC6.0, which of the following is the correct Order Category for Plant Maintenance Order Type ?

(only one answer)

A)     10.
B)     20.
C)     30.
D)     40.
E)     50.
.

Monday, April 29, 2013

Question no 1897 : Non Plant dependent Parameters for Maintenance Order Type

In SAP PM ECC6.0, the following parameters assigned to the Maintenance Order Type are not Plant dependent ?

(more then one answers)

A)    Costing Variant.
B)    Settlement Profile.
C)    Number Range.
D)    Define Time for Settlement Rule.
E)    Maintenance Activity Types assignment.

Sunday, April 28, 2013

Question no 1896 : Number Range for Maintence Plan

In SAP PM ECC6.0, the following are correct description of the number range for Maintenance Plan ?

(more then one answers)

A)    The Maintenance Plan category can have either internal or external number range or both.
B)    The Maintenance Plan category can have either internal or external number range but not both.
C)    The Number Range for the Maintenance Item is independent of the Maintenance Plan Category.
D)    The Maintenance Plan category's number ranges are Plant dependent.
E)    The Maintenance Item number range is always an internal number.
.

CS01 SAP ERP Customer Service (客戶服務模塊) - Organizational Structure 組織架構







Saturday, April 27, 2013

Question no 1895 : Maintenance Plan Category

In SAP PM ECC6.0 EhP1, the Maintenance Plan Category in SAP Plant Maintenance is used to define which of the following ?

(more then one answers)

A)    Number Range.
B)    Change Document.
C)    Reference Object.
D)    Call Object.
E)    Default Notification Type and Order Type.
.

Friday, April 26, 2013

Question no 1894 : Copying Functional Location

In SAP PM ECC6.0 EhP1, when copying an Functional Location to a new Functional Location, the user can decide to copy or not copy the following objects ?

(more then one answers)

A)    Document assignments.
B)    Permits.
C)    Construction Type.
D)    Equipment.
E)    Partner allocations.
.    

Thursday, April 25, 2013

Question no 1893 : Common features of Functional Location

In SAP PM ECC6.0 EhP2, the common features of Functional Location and Reference Functional Location are ?

(more then one answers)

A)    Both can be assigned with Permit Master.
B)    Both uses the same class type for Classification.
C)    Both can be assigned with Measuring Point.
D)    Both can be assigned with Construction Type.
E)    Both cannot be linked to the Material Serial Number.
.

Wednesday, April 24, 2013

Question no 1892 : Permits

In SAP PM ECC6.0 EhP1, Permit Master can be assigned to which of the following Plant Maintenance Objects ?

(more then one answers)

A)    Reference Functional Location.
B)    Equipment Master.
C)    Measuring Point.
D)    Maintenance Task List.
E)    Functional Location.
.

Tuesday, April 23, 2013

Question no 1891 : Maintenance Notification Number Range

In SAP PM ECC6.0, the Number Range assignment for the Maintenance Notification are the following ?

(more then one answers)

A)    Each Number Range Group can have either internal or external number range but not both.
B)    Each Number Range Group can have either internal or external number range or both.
C)    Each Number Range Group can be assigned with either one or more Maintenance Notification Types.
D)    The Number Range for Maintenance Notification Type is 12.
E)    The Number Range Group is assigned to the Maintenance Planning Plant.
.

Monday, April 22, 2013

Question no 1890 : Field Selection for Maintenance Notification

In SAP MM ECC6.0, which of the following are influencing factors of field selection for the Maintenance Notification ?

(more then one answers)

A)    Activity Category.
B)    Catalog Profile.
C)    Notification Type.
D)    Notification Category.
E)    Notification Origin.
.

Sunday, April 21, 2013

CS02 SAP ERP Customer Service - Technical Objects












Question no 1889 : Status Profile in Plant Maintenance

In SAP PM ECC6.0, the Status Profile can be assigned to which of the following in Plant Maintenance ?

(more then one answers)

A)     for Notification Type.
B)     for Activities.
C)     for Tasks.
D)     for Damages.
E)     for Catalog Profile.

Saturday, April 20, 2013

PM Factory Calendar in Work Order







Question no 1888 : Maintenance Notification Type

In SAP PM ECC6.0, which of the following statements are TRUE about the Maintenance Notification Type configuration ?

(more then one answers)

A)    The Maintenance Notification Type must be assigned to the Planning Plant in the customizing.
B)    A Maintenance Notification Type can have either an internal or external number range and not both.
C)    Once the Notification Type is created, the Notification Category cannot be changed.
D)    Priority Type assignment to the Notification Type is optional.
E)    An Object Info Key can be assign to one or more Notification Types.
.

Friday, April 19, 2013

Question no 1887 : Plant Maintenance Catalog Profile

In SAP PM ECC6.0, Catalog Profile can be assigned to which of the following Plant Maintenance Objects ?

(more then one answers)

A)    Notification Type.
B)    Maintenance Order Type.
C)    Functional Location. 
D)    Reference Functional Location.
E)    Equipment.
.

Thursday, April 18, 2013

Question no 1886 : Catalog Type for Plant Maintenance

In SAP PM ECC6.0, which of the following standard Catalog Type cannot be used in Maintenance Notification ?

(only one answer)

A)    Cause of damage
B)    Object parts
C)    Damage
D)    Task
E)    Usage Decision
.

Wednesday, April 17, 2013

Question no 1885 : Scheduling Agreement

In SAP MM ECC6.0, which type of schedules are available for scheduling agreement ?

(more then one answers)

(A)   Delivery schedule
(B)   Forecast schedule
(C)   JIT schedule
(D)   Release order schedule
(E)   Sequenced Forecast release orders schedule
.

Tuesday, April 16, 2013

Question no 1884 : Delivery Schedule Generation by MRP

In SAP MM ECC6.0, delivery schedules for scheduling agreements are automatically created during the MRP run provided the following pre-requisites are done ?

(more then one answers)

(A)   Source list for scheduling agreement with MRP indicator “2” (Record relevant to MRP Scheduling lines generated automatically), MRP planning run control data for delivery schedule “3” (Schedule lines), and Material master Purchasing views Plant level Auto delivery schedule is set.

(B)   Source list for scheduling agreement with MRP indicator “2” (Record relevant to MRP Scheduling lines generated automatically), MRP planning run control data for delivery schedule “3” (Schedule lines), and Vendor master purchasing organization date view Auto delivery schedule is set.

(C)   Source list for scheduling agreement with MRP indicator “2” (Record relevant to MRP Scheduling lines generated automatically), MRP planning run control data for delivery schedule “3” (Schedule lines), and Purchasing info record’s purchasing organization data view Auto delivery schedule is set.

(D)   Source list for scheduling agreement with MRP indicator “2” (Record relevant to MRP Scheduling lines generated automatically), MRP planning run control data for delivery schedule “3” (Schedule lines), and Material master MRP 2 views Plant level Auto delivery schedule is set.

(E)   Source list for scheduling agreement with MRP indicator “2” (Record relevant to MRP Scheduling lines generated automatically), MRP planning run control data for delivery schedule “3” (Schedule lines).

Monday, April 15, 2013

Question no 1883 : Outline Agreement

In SAP MM ECC6.0, which of the following statements are not true about outline agreements ?

(more then one answers)

(A)   Purchase orders are used to release contract items.
(B)   Purchase orders are used to release contract and scheduling agreement items.
(C)   Goods receipt against contracts are not possible.
(D)   Goods receipt against contracts are possible provided the delivery schedules are created within the contract and not using purchase orders.
(E)   Goods receipt is done against the purchase orders but invoice verification is with reference to the contract as the prices are stored in the contract.

Sunday, April 14, 2013

Question no 1882 : Purchasing Scenario

In SAP MM ECC6.0, a global enterprise has plants located world wide producing similar products while contracts for all plants are being negotiated at the head quarters using a quantity contract; some of the raw materials may have different prices due to plant logistics. What would be the possible characteristics of the central contract for its raw materials ?

(only one answer)

(A)   Quantity Central contract without plant, with plant conditions.
(B)   Quantity Central contract without plant with info record at the plant level.
(C)   Individual contracts for each material at each plant but created at the central purchasing  organization.
(D)   One central quantity contract with contract line items for each plant.
(E)   Value Central contract without plant with plant conditions.

SAP : Automatic Safety Stock Calculation




















Saturday, April 13, 2013

Question no 1881 : GR and GR non-valuated

In SP MM ECC6.0, “Goods receipt” + “Goods receipt non-valuated” setup in the purchasing line ensures the following ?

(only one answer)

(A)   Accounting document to be posted during goods receipt and Cost Accounting document to be posted during invoice verification.
(B)   Accounting document is never posted at any stage (as no valuation is required) but Cost Accounting document to be posted during invoice verification.
(C)   Both Accounting document and Cost Accounting document are never posted due to no valuation requirement.
(D)   Both Accounting and Cost Accounting document are posted during goods receipt.
(E)   Both Accounting and Cost Accounting document are posted only at invoice verification.

Friday, April 12, 2013

Question no 1880 : Item Category "W"

In SAP MM ECC6.0, item category “W” can only be used in which type of outline agreement ?

(only one answer)

(A)   Value Contract and Quantity Contract.
(B)   Quantity Contract only.
(C)   Value Scheduling agreement,Value Contract, and Quantity Contract.
(D)   Value Scheduling agreement.
(E)   Value Contract only.
.

Thursday, April 11, 2013

Question no 1879 : Message Output

In SAP MM ECC6.0, which of the following purchasing documents do not have output message ?

(more then one answers)

(A)    Purchase requisition
(B)    RFQ
(C)    Purchase order
(D)    Contracts
(E)    Scheduling Agreement
.

Wednesday, April 10, 2013

Question no 1878 : Info Record creation

In SAP MM ECC6.0, an info record can be created or updated from which of the following sources ?

(more then one answers)

(A)   Purchase order
(B)   Purchase requisition
(C)   Contracts
(D)   Scheduling agreement
(E)   Delivery schedule

Tuesday, April 9, 2013

Question no 1877 : Calculation Schema

In SAP MM ECC6.0, the calculation schema RM0000 in the purchasing order item conditions is determined via combination setups of “Schema group” in which master data ?

(only one answer)

(A)   Vendor (purchasing organization data view) and material master (purchasing organization of purchasing data view)
(B)   Vendor (purchasing organization data view) and material master (plant of purchasing data view)
(C)   Vendor (purchasing organization data view) and Purchasing organization.
(D)   Purchasing info record (purchasing organization data view) and Purchasing organization.
(E)   Purchasing info record (purchasing organization data view) and Vendor (purchasing organization data view).

Monday, April 8, 2013

Question no 1876 : Info Record scenarios

In SAP MM ECC6.0, an info record can be created with the following scenarios :

(more then one answers)

(A)   Material group info record without material master and plant.
(B)   Material group info record without material master but with plant.
(C)   Material info record without vendor and plant.
(D)   Material info record without plant.
(E)   Subcontracting material info record without plant.

Sunday, April 7, 2013

Question no 1875 : PR to PO Auto Generation

In SAP MM ECC 6.0, when purchase orders are to be created automatically via purchase requisition is a single session; select the correct pre-requisites from the following ?

(more then one answers)

(A)   “Auto PO” flag in the purchasing view of the material master.
(B)   “Auto PO” flag in the relevant purchasing info record.
(C)   “Auto PO” flag in the source list for the material master.
(D)   “Auto PO” flag in the purchasing organization data view of the vendor master.
(E)   “Auto PO” flag in the purchasing organization data view in the material master.

Saturday, April 6, 2013

Question no 1874 : NLAG

In SAP MM ECC6.0, Characteristics of “NLAG” material type are the following ?

(more then one answers)

(A)   Accounting data view is not selectable when creating the material master.
(B)   Accounting data view is selectable when creating the material master but not mandatory.
(C)   Account assignment is mandatory when purchasing document is issued.
(D)   MRP data views are not selectable when creating the material master.
(E)   MRP data views are selectable when creating the material master but not mandatory.

Friday, April 5, 2013

Question no 1873 : MRP Calculation

In SAP MM and PP ECC6.0, general sequence of Consumption Based MRP run is depicted by which of the following sequence ?

(only one answer)

(A)   Net Calculation -> Lot sizing -> Procurement type -> Procurement dates
(B)   Net Calculation -> Procurement type -> Lot sizing -> Procurement dates
(C)   Net Calculation -> MRP Explosion -> Lot sizing -> Procurement type -> Procurement dates
(D)   Net Calculation -> Lot sizing -> Procurement type -> Procurement dates -> BOM Explosion
(E)   Net Calculation -> Lot sizing -> Procurement dates -> Procurement type -> BOM Explosion

Thursday, April 4, 2013

Question no 1872 : Facilities in the S/R List

In SAP MM and PP ECC6.0, the planner wish to have several navigation possibilities from the Stocks requirement list to other transaction screens, which of the following feature would be appropriate ?

(only one answer)

(A)   Navigation Profile
(B)   MRP Profile
(C)   Planning Profile
(D)   MRP Tree Profile
(E)   Context-sensitive Profile

Wednesday, April 3, 2013

Question no 1871 : GR Processing Time

In SAP MM and PP ECC6.0, goods receipt processing time is used to determine ____________ .

(only one answer)

(A)   Delivery date
(B)   Opening date
(C)   Closing date
(D)   End date
(E)   Stock available date

Tuesday, April 2, 2013

Question no 1870 : MRP Parameter

In SAP MM and PP ECC6.0, most of the planning parameters for MRP run at setup at the plant parameter, groups of material within the same plant have similar planning parameter characteristics. Which of the following you would recommend looking at to setup planning parameters below the plant level.

(only one answer)

(A)   MRP controller.
(B)   MRP group.
(C)   MRP storage location.
(D)   MRP area.
(E)   MRP procurement key.
.

Monday, April 1, 2013

Question no 1869 : Planning Error

In SAP MM and PP ECC6.0, the planner creates a material master with a re-order quantity of 500, all the other necessary data views were appropriately created. He/She then executes the single item single level MRP run in MM but the system prompts an error “Planning for material M1 will not be automatically carried out ..”. The planner checks the stocks and confirms the stocks quantity is zero”. Subsequently, the planner checks the planning file for the material and realized that it was not created.

What could have gone wrong ?

(only one answer)

(A)   Minimum lot size was more than 500, it was mistakenly set as 800 and MRP cannot compute correctly.
(B)   The procurement type in the MRP 1 view was blank as it was not entered during the material master creation step.
(C)   The MRP type in the material master was mistakenly created as “ND” for no planning.
(D)   Purchase info record has not been created yet; therefore MRP cannot proceed.
(E)   Purchasing data view was not created yet, therefore MPR cannot proceed.