In SAP QM ECC6.0 EhP6, which of the following master data objects in QM are allowed to be managed using Engineering Change EXCEPT ?
(more than one answers)
A) Inspection Plan.
B) Master Inspection Characteristics.
C) Material Specification.
D) Inspection Method.
E) Sampling Procedure.
.
(more than one answers)
A) Inspection Plan.
B) Master Inspection Characteristics.
C) Material Specification.
D) Inspection Method.
E) Sampling Procedure.
.
Answer: B, C, D, E
ReplyDeleteOnly the Inspection Plan.
ReplyDelete