In SAP S/4HANA Logistics General, note the Leading Change Master "CM0" and the Change Package "CM1" below, the Chang Package "CM1" was set with object BOM Changes and applied to a BOM. When will the ECM active for a Production Order creation ?
(more than one answers)
A) The Packages must be Technically Released
B) The Leading Change Masters must be Technically Released
C) The Packages must be set with with appropriate Release Key
D) The Leading Change Master must be set with appropriate Release Key
E) Both the The Leading and Package Change Master must have a Reason for Change.
.
Answer: A, B, D
In S/4 1909, the Leading Change Master comes automatically with a Release Key and the Package Change Master do not have a Release Key.
Pre-requisite for the ECM active to the Production Creation are:
Packages (or lower level ECM) must be set "Technically Released"
Leading Package must be set "Technically Released"
Leading Package must be set with appropriate Release Key









.jpg)
.jpg)
.jpg)
.jpg)
.jpg)

.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)