This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Thursday, April 30, 2015

Question no 3011 : WMS 2-step Outbound Wave Pick

In SAP LE-WM as at ECC6.0 EhP6, on WM interface with SD for Outbound delivery of a 2-step Wave Pick scenario, which for following are correctly depicting standard SAP process for this scenario ?

(more than one scenario)

A)   A separate movement type is configured for step-1 of the Wave Pick to determine the initial interim Storage Type.
B)   In Step-1, the system generate 1 transfer order for each delivery order.
C)   In Step-2, the system generate 1 transfer order for each delivery order.
D)   2-step relevancy are set at both material for the warehouse in the material master and also in the Warehouse master in the configuration.
D)   2-step relevancy are set at both material for the warehouse in the material master and also in the Storage Type in the configuration.
.

LE WMS-SD Output with 2-step WM Picking Conceptual Process Flow































Wednesday, April 29, 2015

Question no 3010 : Inbound delivery for WMS relevant material purchase order

In SAP MM-WM as at ECC6 EhP6, Inbound process requirement of WMS processing before Post Goods Receipt for Purchase Order is determined via which of the following setting in the Purchase Order item detail ?

(only one answer)

A)  Purchase Order Document Type.
B)  Inbound relevancy indicator copied from the Material WM data view.
C)  Confirmation Control Key.
D)  Inbound indicator set to Storage Location.
E)  No seetings required, both MIGO and VL31N are flexible choices of goods receipt.
.

WMS Removal Strategy - Large/Small Quantity Strategy



















Question no 3009 : Staging WMS material to Production

In SAP LE-WMS as at ECC6.0 EhP6, which of following staging methods where the staging of quantities of the production supply area are independent of the production order quantities ?

(only one answer)

A)   Pick list item.
B)   Pick list item and Crate Parts.
C)   Create Parts.
D)   Release Order Parts.
E)   Pick list and Release Order Parts.

Question no 3008 : Staging for Production Order in a WMS environment

In LE-WMS as at ECC6.0 EhP6, the following configuration parameter for Production Scheduling Profile for staging material to a Production Order from a WMS environment, in this case transfer requirement will be generated for which types of material when the Production Order is Release ? 



(only one answer)

A)   Release Order Parts only.
B)   Crate Parts only.
C)   Pick Parts only.
D)   Pick Parts and Release Order Parts.
E)   Pick Parts, Release Order Parts, and Crate Parts.
.

Tuesday, April 28, 2015

Question no 3007 : Mixed Storage

In SAP LE-WMS as at ECC6.0 EhP6, 'Mixed Storage' allows different materials to be putaway in the same storage bin, which of the following directly influences this possibility ?

(only one answer)

A)   Storage type, Storage section, Material Master.
B)   Storage type, Material Master.
C)   Bin type, Material Master.
D)   Storage type.
E)   Movement Type, Material Master Special Storage Indicator.
.