Question no 2530 : LTP Scenario

In SAP Demand Management, the following can be set in the Long Term Planning scenario ?

(more than one answers)

A)   BOM Selection ID.
B)   Routing Selection ID.
C)   Planning Period.
D)   MRP Type.
E)   Lot Size Key.
.

3 comments:

  1. A, B) You can set the Selection ID for BOM but not for Routing in the LTP Scenario. However, you can set a Capacity version which is something you can add in the Capacity Header of Work Centers; different capacity version allows you to store a different available capacity and this can be selected for simulation in LTP Planning.

    ReplyDelete
  2. C) While you can choose the propagation of planning period of the Plannd Independent Requirement to be subjected to the LTP scenario, you can also select a Plaaning Period within which LTP Planning should be executed.

    ReplyDelete
  3. D, E) No, you cannot selected a different MRP type but you can set an indicator so that Dependent Requirements can be created for Re-Order Point Planning materials. There is also a inidcator called 'Gross Lot Size' so that you can switch the lot size to a Periodic Lot Size for all materials in the LTP Scenario.

    ReplyDelete