Question no 2534 : Structuring PP Master Data

In SAP PP Master Data, the following structuring is possible EXCEPT ?

(only one answer)

A)   Both BOM and Routing can be created without a Plant but must have a material as a header.
B)   A BOM can be created without a Material and a Plant as a header.
C)   A Routing can be created without a Plant and a Material as a header.
D)   A Routing can be created without a Plant but must be created with a Material as a header.
E)   A Routing can be created without a Material but a Plant is mandatory.
.

2 comments:

  1. A BOM must a SAVED with a material but need not have a Plant when using CS01. However, you will have to allocate the BOM to one or more plants in CS07.

    When creating and saving a Rouuting, it must have a plant be need not have a material as a header. You can allocate/assign to one or material in the header Routing in CS02.

    ReplyDelete