Wednesday, April 10, 2024

Question no 3996 : Non-Order related Replenishment

In SAP Manufacturing as at ECC6 EhP7, the transaction MF60 "Pull List" for replenishment of materials for Non-Order related replenishment for a series of Production Orders uses which of the following Control Cycle method ?
(more than one answers)

A. Crate parts.
B. Pick parts.
C. Release order parts.
D. Event-Driven Kanban.
E. Storage Location Level.
.

Answer: C

Wednesday, April 3, 2024

Question no 3995 : Pull List

In SAP Manufacturing as at ECC6 EhP7, the transaction MF60 "Pull List" can replenish for which of the following ?

(more than one answers)

A. Process Orders.
B. Production Orders.
C. Inspection Lot.
D. Network Orders.
E. Planned Orders.
.

Answer: A, B, E

Saturday, March 30, 2024

Question no 3994 : Pull List in Manufacturing

In SAP Production Planning & Execution integration with the WM system in ECC6 EhP8, which of the following depicts Pull list based on each Production/Process Order in a WM Warehouse System"
(only one answer)

A. Crate parts.
B. Pick parts.
C. Release order parts.
D. Event-Driven Kanban.
E. Storage Location Level.
.

Answer: B

A. Crate Parts are replenished using "Kanban Containers" and not via the Pull list.
B. Pick Parts are Pull list to pick parts based on each Production/Process order.
C. Release Order Part are picked based on a range of Production/Process order where the picking results is a total quantity.
















Tuesday, January 12, 2021

Question no 3786 : MF50

In SAP PP as at ECC6.0 EhP6, the T-Code MF50 Planning Table can be used for the following ?

(more than one answers)

A)  Read "Active" Planned Independent Requirements.
B)  Show Production Order quantities.
C)  Show Make-to-Order scenario quantities.
D)  Show Make-to-Stock scenario quantities.
E)  Show capacities.
.

Answers: A, B, C, D, E

MF50 interface shows a "spreadsheet-like" tabular format to view the Planning data that can show MTO or MTS scenario data as well as Capacities data
 

Wednesday, December 2, 2020

Question no 3769 : Cost Collector in PP

In PP as at ECC6.0 EhP6, which of the following can use a Cost Collector to collect costs ?

(more than one answers)

A)  Repetitive Planned Orders.
B)  Planned Orders for Shop Floor Production.
C)  Production Orders.
D)  Planned Independent Requirement.
E)  Planning Scenario.
.

Click "1 comment" for possible solution.

Tuesday, December 1, 2020

Question no 3768 : Control Features of the Repetitive Manufacturing Profile

In SAP PP as at ECC6.0 EhP6, which of the following are the Control Features of the Repetitive Manufacturing Profile ?

A)  Whether you want to backflush activities.
B)  Whether you want to work with reporting points in make-to-stock REM.
C)  How you want to process errors which occur when backflushing.
D)  Storage Location for Backflushing.
E)  Auto Goods Receipt indicator.
.

Answers: A, B, C

You use the repetitive manufacturing profile to control how you want to carry out planning and backflushing in repetitive manufacturing.
The repetitive manufacturing profile is a mandatory prerequisite for repetitive manufacturing. Using the control paramters, you define the following, for example:
. Whether you want to backflush activities.
. Whether you want to work with reporting points in make-to-stock REM.
. How you want to process errors which occur when backflushing.

Monday, December 23, 2019

Question no 3675 : Repetitive Manufacturing

In SAP PP as at ECC6.0 EhP6, which of the following are correct about Repetitive Manufacturing ?

(more than one answers)

A)  REM Planned Orders can be generated via MRP Run.
B)  Goods Issue and Goods Receipt is possible with reference to a REM Planned Orders.
C)  REM Planned Orders can collect costs just like a Production Orders.
D) BOM and Routing are optional in Repetitive Production Version.
E)  REM Planned Orders can be viewed in the Stocks Requirements Lists.
.
Click "1 comment" for Suggested answers

Friday, November 23, 2018

Question no 3601 : Production Methods

In SAP PP as at ECC6.0 EhP6, if a manufacturing facility has the following characteristics:
. dedicated production line
. very high product stabilities
. reduce of goods movements to reduce costs
. high repetition of production schedule
Which of the following Production Methods would you recommend ?

(only one answer)

A)  Process Order.
B)  Production Order.
C)  Production Campaign.
D)  Kanban.
E)  Repetitive Manufacturing.
.

Answer: E

PP-REM, Repetitive Manufacturing

Thursday, April 16, 2015

Question no 2976 : Repetitive Manufacturing Backflush Batch Procedure

In SAP SD as at ECC6.0 EhP6, in repetitive manufacturing, the system uses __________________ to determine the batch determination procedure during REM Backflush process.

(only one answer)

A)  Production Scheduler Profile.
B)  Movement Type.
C)  Order Type and Plant.
D)  Order Type.
E)  Repetitive Manufacturing Profile.
.

Friday, April 10, 2015

Question no 2952 : Batch Determination for Pull List in Repetitive Manufacturing

In SAP PPDI Repetitive Manufacturing, which of the following the standard key characteristics of batch detemnation startegy for the Pull list replenishment ?

(only one answer)

A)  Plant and Order Type.
B)  Planning Plant and Order Type.
C)  Production Scheduler Profile.
D)  Production Supervisor.
E)  Plant and Movement Type.
.

Tuesday, October 2, 2012

Question no 1685 : REM Profile

In SAP PP REM ECC6.0, the Repetitive Manufacturing Profile provides which of the following controls ?

(more then one answers)

A)    Online correction of backflushing.
B)    GR to be posted automatically at last reporting point.
C)    How Planned Orders are reduce during goods receipt.
D)    Treatment of Planned Order creation when reversing backflush.
E)    Which BOM and Routing used for the Planned Orders.
.