In SAP MM or PP MRP, the following are possible correct use of the 'Scope of Planning' in MRP run EXCEPT ?

(only one answer)

A)    It cannot be used for Single Item Planning runs.
B)    It can be used in conjunction with the MRP user exit to propagate the materials for a planning run.
C)    It can contain a sequence for Plant or combination of Plant/MRP Area to control the sequence of MRP run.
D)    Only one 'Scope of Planning' can be selected for each Planning run.
E)    It is only used of MRP but not CBP materials.
.

1 comment:

  1. Both MD01 and MDBT can use it and the two t-code do not limit MRP or CBP materials.

    ReplyDelete