This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Friday, June 29, 2018

Question no 3554 : Movement Type

In SAP MM as at ECC6.0 EhP7, the following functions can be controlled by the Movement Type EXCEPT ?

(only one answer)

A)   Auto PO.
B)   Generate Physical Inventory Document.
C)   Delivery Complete Indicator.
D)   Stock Determination Rule.
E)   Create Storage Location Automatically.
.

Answer: C

OMJJ

Hana for Logistics - Initial Investigative look at Executing Planning Run using MRP or PPDS Heuristics in S/4 HANA

Thursday, June 28, 2018

Question no 3553 : Planned and UnPlanned Consumption updating

In SAP MM as at ECC6.0 EhP6, which of the following Controls the updating of Planned and Unplanned Consumption data for a Material ?

(only one answer)

A)   Movement Type.
B)   Material Group.
C)   Plant.
D)   Document Type.
E)   Transaction Code.
.

Answer: A

Consumption Posting Field in Movement Type.. visit OMJJ

S/4 HANA Edition - Key Release, FPS, SPS

Wednesday, June 27, 2018

Question no 3552 : IBAU

In SAP PM as at ECC6.0 EhP6, Material Type "IBAU", what are TRUE statements about Materials created using this Material Type ?

(more than one answers)

A)  It is not for Inventory Management.
B)  It can be used for Material BOM Header.
C)  Not Purchasing possible.
D)  It cannot be selected as a Component in the Order for Reservation creation.
E)  It does not have an Accounting data view.
.

Answer: A, B, C, D, E

IBAU material type only provided with Basic and Classification data view. Hence, no Purchasing, IM, or Stock/Qty posting.

Case Study PP - Production Versions for Assembly Lines

Tuesday, June 26, 2018

Question no 3551 : Single Cycle Plan Characteristics

In SAP PM as at ECC6.0 EhP6, which of the following are Characteristics of  a Single Cycle Maintenance Plan ?

(more than one answers)

A)  Each Plan can have only one time-based cycle.
B)  Each Plan can have only one counter.
C)  Each Plan can have one or more Maintenance Item.
D)  Each Maintenance Item can have one or more Task List.
E)  Each Maintenance Item can have only one Technical Object.
.

Answer: A, B, C

A,B) Each Plan can have either time-based cycle or a counter.
C) Except if the call object is SES, IP41 can have one or more Maint.Item.
D) Only one Task list per Maintenance Item (if call object is Notification or Order), its optional.
E) Object list can have multiple Technical Objects.
 

Hana for Logistics - Business Partner (Vendor) Configuration

Thursday, June 21, 2018

Material Management (Pricing) - Delivery Cost Parameters

Hana for Logistics - Material Type Parameters (Product Type Group)

Question no 3550 : Calling Maintenance Notifications

In SAP PM as at ECC6.0 EhP6, note the SAP Menu, which of the following Maintenance Plan transactions creates Maintenance Notification when Scheduled ?

(more than one answers)

A)  IP41 Single Cycle Plan.
B)  IP42 Strategy Plan.
C)  IP43 Multiple Counter Plan.
D)  IP40 For Service Procurement.
E)  IP50 For Contract Item.
.

Answer: A, B, C

A, B, C) will call Maintenance Notification depending on MP Category select.
D) calls Service Entry Sheet.
E) IP50 is for Customer Service, therefore it can call Service Notification or Service Order



Question no 3549 : Maintenance Notification creation

In SAP PM as at ECC6.0 EhP6, you can create Maintenance Notification via which of the following process ?

(more than one answers)

A)  Maintenance Order.
B)  Order Confirmation.
C)  Maintenance Plan Scheduling.
D)  IE4N Equipment Dismantling.
E)  Measurement Reading entries.
.

Answer: A, B, C, D, E

A) In IW31 or IW32, in the Header Data screen, click Notification icon.
B) In IW41 and IW42 during Confirmation.
C) In IP10 or IP30 when Scheduling an MP with call object Notification.
D) IE4N processes results in a Notification.
E) When entering Measurement Readings for Attribute based Measuring Point, the Code/Code Group selected can trigger Maintenance Notification via Follow-up Actions.

Wednesday, June 13, 2018

Question no 3548 : Material Type for Material Master PRT

In SAP PM as at ECC6.0 EhP6, which of the following is the Standard SAP Delivered Material Type for creating a PRT Material Master ?

(only one answer)

A)   PRT.
B)   ERSA.
C)   FHMI.
D)   MPRT.
E)   PRTM.
.

Answer: C

Material Type "FHMI".

Sunday, June 10, 2018

Question no 3547 : Document Assignment in SAP PM

In SAP PM as at ECC6.0 EhP6, which of the following objects can be assigned with Documents from SAP DMS ?

(more than one answers)

A)  BOM Header.
B)  BOM Item.
C)  Task List Header.
D)  Task List Operation.
E)  Equipment Master.
.

Answer: A, B, D, E

DMS Documents can be assigned to:
. BOM Header
. BOM Item (as Item Category "D")
. Material Master
. Task List Operations as PRT
. Measuring Point
. Classification Characateristics
. Functional Location
. Equipment

Project System Accounting - Calculate Overhead

Wednesday, June 6, 2018

Project System Accounting - Handle Vendor Invoices

Question no 3546 : Pricing Schema Determination

In SAP MM as at ECC6.0 EhP6, which of the following assignments are correct to determine a Pricing Schema for a Purchase Order ?

(more than one answers)

A)  Assign Schema Group to Vendor Master.
B)  Assign Schema Group to Purchasing Group.
C)  Assign Schema Group to Purchasing Organization.
D)  Assign Schema Group to Company Code.
C)  Assign Schema Group to Material Master.
.

Answer: A, C

Pricing Schema for PO is dependent on Vendor Master and Purchasing Organization
A) Vendor Master Purchasing data view Schema Group
C)  IMG - MM - Purchasing - Conditions - Define Schema Determination

Tuesday, June 5, 2018

Question no 3545 : Warehouse Management Structuring

In SAP LE-WMS as at ECC6.0 EhP6, which of the following WMS structuring is not correct ?

(more than one answers)
A)  A Storage Bin can be assigned to both a Storage Section and a Picking Area. 
B)  A Picking Area definition for a Storage Bin is optional.
C)  A Storage Type for a Warehouse can have one or more Putaway Strategies.
D)  Storage Section entry is optional when creating a Storage Bin.
E)  A Storage Type must have a minimum of one Storage Section.
.

Answer: C, D

A) in LS01N, you can see both Storage Section and Picking Area field entry for a Storage Bin.
B, D, E) in LS01N, standard SAP dictates Storage section mandatory, Picking area optional.
C) IMG - LE - WM - Master Data - Define Storage Type (check any Storage Type, only one Putaway Strategy field).