In SAP PP, the settings for safety time can be of the following EXCEPT ?
(only one one answer)
A) Ignore safety time in the material master.
B) Via a safety time profile (time-dependent safety times) in the material master.
C) Safety time taken to consideration for all requirements.
D) Safety time taken to consideration for independent requirements only.
E) Safety time taken to consideration for selected mrp elements.
.
(only one one answer)
A) Ignore safety time in the material master.
B) Via a safety time profile (time-dependent safety times) in the material master.
C) Safety time taken to consideration for all requirements.
D) Safety time taken to consideration for independent requirements only.
E) Safety time taken to consideration for selected mrp elements.
.
In the MRP 2 view, there is a control indicator that decides if
ReplyDelete. safety time is to be ignore
. only for independent requirements
. for all requirements
The safety time in number of days is ready to be entered in the mrp2 view. Alternatively, you can assign a safety time profile (which contain time dependent safety times).