In SAP QM as at ECC6.0 EhP6, what methods can be used to update the Quality Level ?
(more than one answers)
A) Manual Maintenance.
B) Entering a Result Recording.
C) When the Inspection Lot is first generated.
D) At Usage Decision.
E) When a Source Document like a Purchase Order is created which was designed for QM processing at goods receipt.
.
(more than one answers)
A) Manual Maintenance.
B) Entering a Result Recording.
C) When the Inspection Lot is first generated.
D) At Usage Decision.
E) When a Source Document like a Purchase Order is created which was designed for QM processing at goods receipt.
.
Answer: A, C, D
ReplyDeleteA) use QL02 to change quality level for a material.
ReplyDeleteC, D) Quality Level uprate can be configured either at Inspection lot creation or at the Piont of Usage Decision.
ReplyDelete