This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Thursday, June 30, 2016

Question no 3199 : Quality Level maintenance

In SAP QM as at ECC6.0 EhP6, what methods can be used to update the Quality Level ?

(more than one answers)

A)   Manual Maintenance.
B)   Entering a Result Recording.
C)   When the Inspection Lot is first generated.
D)   At Usage Decision.
E)   When a Source Document like a Purchase Order is created which was designed for QM processing at goods receipt.
.

3 comments:

  1. A) use QL02 to change quality level for a material.

    ReplyDelete
  2. C, D) Quality Level uprate can be configured either at Inspection lot creation or at the Piont of Usage Decision.

    ReplyDelete

Note: Only a member of this blog may post a comment.