Question no 3175 : Control Parameters in Sales Document

In SAP SD as at ECC6.0 EhP6, study the following parameters and determine which of the followings keys provides those parameters:

. determines if requirements are transferred
. determines if availability check should be carried out
. determines if goods issues postings are allowed.
. determines if the schedule line relevant for delivery

(only one answer)

A)  Sales Document Type.
B)  Item Category.
C)  Schedule line Category.
D)  Sales Area.
E)  Customer Material Info Record.
.

2 comments:

  1. The various schedule line categories are controlled in different ways:

    The schedule line AT in inquiries is used only for information.
    No requirements are transferred and no availability check is carried out for the schedule lines BN and CN.
    Requirements are transferred and the availability of the material is checked for the schedule lines BP and CP.
    No stocks are managed for the schedule line categories BT, CT and CX. No goods issue is posted for the categories BT and CT. However, goods issue is posted for CX.
    The schedule line categories BV and CV are controlled in the same manner as the categories BN and CN. However, requirements can be passed on for analysis purposes.
    Goods receipt is posted for the schedule line DN in a returns document.
    The schedule line categories CN, CP, CT, and CV are relevant for delivery; the other schedule line categories are not.