This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Thursday, June 30, 2016

Question no 3198 : Inspection Lot creation

In SAP QM as at ECC6.0 EhP7, the following business processes will be able to trigger an inspection lot EXCEPT one ?

(only one answer)

A)  Goods Receipt from a Scheduling Agreement.
B)  Goods Issue for a Maintenance Order.
C)  Stock Transfer between Storage Locations within the same Plant.
D)  Maintenance Plan Scheduling.
E)  MRP run.
.

Answer: E

At least I was not able to design into it any possibility that an MRP run can trigger an Inspection Lot (I could be wrong !!) but A, B, C, D I am very sure about it.

3 comments:

  1. A) You can create, change or delete a Quality Level.

    ReplyDelete
  2. C, D) In the Configuration, you can decide if the Quality Level is updated at Inspection Lot Creation or Usage Decision time.

    ReplyDelete

Note: Only a member of this blog may post a comment.