In SAP PP as at ECC6.0 EhP7, what the differences and similarities of the MRP list and Stock Requirement list, select the correct answer ?
(more than one answers)
A) Both can be created by MRP run.
B) Both will always be created by MRP run.
C) MRP list is static until the next MRP run while S/R list is always dynamic.
D) Whether MRP list or S/R list is static or dynamic depending on the MRP Plant parameters.
E) Creation of MRP list can be dependent on exception messages.
.
(more than one answers)
A) Both can be created by MRP run.
B) Both will always be created by MRP run.
C) MRP list is static until the next MRP run while S/R list is always dynamic.
D) Whether MRP list or S/R list is static or dynamic depending on the MRP Plant parameters.
E) Creation of MRP list can be dependent on exception messages.
.
Answer: A, C, E
ReplyDeleteA, B, C, D) MRP list is always static until the next MRP run (no parameters to control this as at ECC6 EhP7), however S/R list is always dynamic.
ReplyDeleteE) You can decide if MRP list should be created or if it is created depending on Exception Messages.