In SAP PM as at ECC6.0 EhP7, which of the following are PRT types that can be assigned to a Maintenance Task Operation ?

(more than one answers)

A)   Material PRT.
B)   Equipment PRT.
C)   Document PRT.
D)   Equipment PRT.
E)   Measuring Point PRT.
.

1 comment:

  1. Measuring Point as at PRT is the latest additional to the PRT types that can be assigned to the Maintenance Task Operation.