In SAP PM as at ECC6.0 EhP7, which of the following are PRT types that can be assigned to a Maintenance Task Operation ?
(more than one answers)
A) Material PRT.
B) Equipment PRT.
C) Document PRT.
D) Equipment PRT.
E) Measuring Point PRT.
.
(more than one answers)
A) Material PRT.
B) Equipment PRT.
C) Document PRT.
D) Equipment PRT.
E) Measuring Point PRT.
.
Measuring Point as at PRT is the latest additional to the PRT types that can be assigned to the Maintenance Task Operation.
ReplyDelete