In SAP MRP, which of the following are per-requisites of an MRP run for a Mateiral in a Plant ?
(more than one answers)
A) MRP activated at the Plant level in the Customizing.
B) MRP area activated at the Plant level in the Customizing.
C) A Vaild MRP Type in the MRP 1 data view in the Material Master.
D) MRP Plant parameter was created.
E) A valid Availability Check Group in the MRP 3 data view in the Material Master.
.
(more than one answers)
A) MRP activated at the Plant level in the Customizing.
B) MRP area activated at the Plant level in the Customizing.
C) A Vaild MRP Type in the MRP 1 data view in the Material Master.
D) MRP Plant parameter was created.
E) A valid Availability Check Group in the MRP 3 data view in the Material Master.
.
B) MRP Area activation is not necessary to perform MRP run at the Plant level.
ReplyDeleteE) AV Check Group in the MRP 3 data view is not required for MRP run.