In SAP MRP, review the following material master lot size definition, deduce what is wrong with it ?
(more than one answers)
A) You can have either one Rounding Profile or Rounding Value but not both in this situation.
B) You cannot have both Rounding Profile and Rounding Value regardless of the Lot Size key.
C) Neither Rounding Profile nor Rounding Value can be entered if the Lot Size key is FX.
D) The system will request you to change the Lot Size key other than FX when saving the Material.
E) This data entry is acceptable.
.
(more than one answers)
A) You can have either one Rounding Profile or Rounding Value but not both in this situation.
B) You cannot have both Rounding Profile and Rounding Value regardless of the Lot Size key.
C) Neither Rounding Profile nor Rounding Value can be entered if the Lot Size key is FX.
D) The system will request you to change the Lot Size key other than FX when saving the Material.
E) This data entry is acceptable.
.
Answer: A, B
ReplyDeleteYou must be very careful here. One Rule is that you cannot have both Rounding Profile and Rounding Value in any lot size definitions as it is not logical.
ReplyDeleteIn the case of the above scenario without minimum or maximum lot sizing data, you can save the lot size definition with either a rounding profile or rounding value (not both).
However, when you have minimum lot size, maximum lot size, and rounding profile, the system may remove all 3 when saving the material master !