Question no 2600 : MRP Area configuration

In SAP MM when using MRP Area (as at ECC6.0 EhP6), which of the following configuration on MRP Area are correct ?

(more than one answers)

A)   Activation of the use of MRP area is at the Plant level.
B)   One or more Storage Locations can be assigned to an MRP Area.
C)   An MRP Area can have only one receiving storage location.
D)   An MRP Area for Storage Location must be 5 alphanumeric and above.
E)   MRP Area of 4 alphanumeric are equal to the Plant definition.

4 comments:

  1. A) Activation of the MRP Area is a the Client level.

    ReplyDelete
  2. B, C) Each MRP Area can have exactly one default Receiving Storage Location. However, you can assign one or more Storage Locations defined as MRP Area.

    ReplyDelete
  3. D, E) If an MRP Area is for Storage Location, it must be defined using 5 or more Alphanumeric characters. You cannot use 4 alphanumeric as it is reserved for Plant definitions.

    ReplyDelete