In SAP MRP, check carefully the lot sizing setup in the S/R list and deduce MRP reaction ?
(only one answer)
A) One Planned Order of 5300.
B) 3 Planned Orders of 2000 each.
C) 2 Planned Orders of 2000 each and 23 Planned Orders of 100 each.
D) 2 Planned Orders of 2000 each and 1 Planned Order of 1300.
E) 3 Planned Orders of 2000 each of 3 Planned Orders of 100 each.
.
(only one answer)
A) One Planned Order of 5300.
B) 3 Planned Orders of 2000 each.
C) 2 Planned Orders of 2000 each and 23 Planned Orders of 100 each.
D) 2 Planned Orders of 2000 each and 1 Planned Order of 1300.
E) 3 Planned Orders of 2000 each of 3 Planned Orders of 100 each.
.
Answer: D
ReplyDeleteNote the Maximum Lot Size of 2000.
ReplyDeleteThe Systems Reaction of initially 2 Planned Orders of 2000 each (since requirement of 5300 falls in the threshold of 900 with a Rounding of 1000).
The remaining (5300 - (2 x 2000) = 1300) will be fulfilled by a box of 1000 and 3 boxes of 100.
MRP result:
2 Planned Orders of 2000 (due to maximum lot size of 2000)
1 Planned Order of 1300 (for 1 box 1000 and 3 box 100)