In SAP MRP, the material was set with lot size key 'EX' (Lot for Lot) with several lot size fine tuning data such as minimum, maximum, and Rounding Profile. The user intends to change the Lot sizing key to 'FX' (Fixed Lot size) of 500.
(only one answer)
A) The Minimum Lot Size is removed.
B) The Maximum Lot Size is removed.
C) The Rounding Profile is removed.
D) The MRP Controller will remain the same.
E) None of the above.
.
The system response the following when you save the Material Master EXCEPT which one ?
(only one answer)
A) The Minimum Lot Size is removed.
B) The Maximum Lot Size is removed.
C) The Rounding Profile is removed.
D) The MRP Controller will remain the same.
E) None of the above.
.
A, B, C) when the lot size key is FX or Fixed Lot Size, the minimum lot size, maximum lot size, rounding profile or rounding value if any will all be removed when saving the material master.
ReplyDeleteD) changing of lot size features do not affect MRP Controller definition.