In SAP MRP, for Storage Location Planning (definition in the MRP4 view at the Storage Location Level) and not referring to MRP Area, which of the following Procurement Type is possible ?
(more than one answers)
A) Consignment.
B) Transfer from Plant to Storage Location.
C) Re-order Point.
D) Storage Location Excluded from MRP run.
E) External Procurement.
.
(more than one answers)
A) Consignment.
B) Transfer from Plant to Storage Location.
C) Re-order Point.
D) Storage Location Excluded from MRP run.
E) External Procurement.
.
Answer: A, B, C, D, E
ReplyDeleteYou have maintained the following entries for the storage location (Storage location MRP screen area) in the material master (MRP 4 view):
ReplyDeleteYou have set the Storage location stock planned separately indicator as the MRP indicator.
You have defined a reorder level and a replenishment quantity (fixed lot size).
You must also decide which type of procurement is to be used for this storage location:
. stock transfer from storage location to storage location in a plant
. stock transfer from another plant
. external procurement directly to the storage location
. in-house production directly to the storage location
. production in an alternative plant
procurement on a consignment basis