Question no 2603 : Storage Location Planning

In SAP MRP, for Storage Location Planning (definition in the MRP4 view at the Storage Location Level) and not referring to MRP Area, which of the following Procurement Type is possible ?

(more than one answers)

A)   Consignment.
B)   Transfer from Plant to Storage Location.
C)   Re-order Point.
D)   Storage Location Excluded from MRP run.
E)   External Procurement.
.

2 comments:

  1. You have maintained the following entries for the storage location (Storage location MRP screen area) in the material master (MRP 4 view):
    You have set the Storage location stock planned separately indicator as the MRP indicator.
    You have defined a reorder level and a replenishment quantity (fixed lot size).
    You must also decide which type of procurement is to be used for this storage location:
    . stock transfer from storage location to storage location in a plant
    . stock transfer from another plant
    . external procurement directly to the storage location
    . in-house production directly to the storage location
    . production in an alternative plant
    procurement on a consignment basis