in SAP MRP as at ECC6.0 Ehp6, when extending the Material in MRP 1 data view to plan the Material in an MRP Area, which of the following parameters are NOT possible in the MRP Area level in the Material Master ?
(more than one answers)
A) Procurement type,
B) Special procurement key.
C) MRP type.
D) MRP controller.
E) Startegy group.
.
A) Procurement type (internal, external, or both) are set only at the Plant level in MRP2 data view. This is defaulted based on parameters defined in the Material Type.
ReplyDeleteE) Strategy group is also onky set at the Plant level in the MRP 3 data view.
ReplyDelete