Question no 2626 : Certificate Check requirement in MIGO

In SAP QM for MM, which of the following determines if Certificate check is required in MIGO ?

(only one answer).

A)    Plant parameter.
B)    Inspection type in the configurstion parameter.
C)    Inspection type detail in the QM data view.
D)    Quality Info Record.
E)    QM Control Key.
.

1 comment:

  1. SPRO - QM - QM in Logistics - QM in Procurement - Define QM Control Key
    Check Certificate requirement indicator.
    Assign the QM Control Key to the Material Master QM data view.