In SAP QM, which of the following are correct about Inspection Plans ?
(more than one answers)
A) An Inspection Plan can be assigned to one or more Plants.
B) An Inspection Plan can be assigned to one or more Materials.
C) QM work center is an optional entry for Inspection Plan operation.
D) One or more PRTs can be assigned to an operation in the Inspection Plan.
E) You can assign Material or Equipment to an Inspection Plan.
.
(more than one answers)
A) An Inspection Plan can be assigned to one or more Plants.
B) An Inspection Plan can be assigned to one or more Materials.
C) QM work center is an optional entry for Inspection Plan operation.
D) One or more PRTs can be assigned to an operation in the Inspection Plan.
E) You can assign Material or Equipment to an Inspection Plan.
.
A, B, E) An inspection Plan is always Plant specific. However you can assign one or more materials (together with Vendor and Customer) to an Inspection Plan. Inspection Plans are for Materials and not Equipment or Functional Location. (as at ECC6.0 EhP5)
ReplyDelete