In SAP MM IM, deduce the scenario of the following MB51 report.
(more than one answers)
A) Plant 1100 is the Supplying Plant and Plant 1200 is the Receiving Plant.
B) Plant 1200 is the Supplying Plant and Plant 1100 is the Receiving Plant.
C) Plant 1200 issued the Transfer Request via STO to Plant 1100.
D) Plant 1100 issued the Transfer Request via STO to Plant 1200.
E) The process was done in a 2 step manner.
.
(more than one answers)
A) Plant 1100 is the Supplying Plant and Plant 1200 is the Receiving Plant.
B) Plant 1200 is the Supplying Plant and Plant 1100 is the Receiving Plant.
C) Plant 1200 issued the Transfer Request via STO to Plant 1100.
D) Plant 1100 issued the Transfer Request via STO to Plant 1200.
E) The process was done in a 2 step manner.
.
Answer: A, C, E
ReplyDeleteMaterial document 4900000048 with movement type 351, see Plant 1100 with SLoc 0001 and Plant 1200 no Storage Location likely indicate that the Goods issue is out from Plant 1100 for the Step 1 process. In this manner, the Plant 1100 would be the Supplying Plant and Plant 1200 the Receiving Plant. Therefore, Receiving Plant 1200 should be issuing the STO to Supplying Plant 1100.
ReplyDelete