Question no 2021 : Maintenance Strategy

In SAP PM ECC6.0, which of the following type of Maintenance Planning requires the entry of a Maintenance Strategy ?

(more then one answers)

A)     Single-Cycle Time based Plan.
B)     Single-Cycle Performance based Plan.
C)     Strategy-Plan Time based.
D)     Strategy-Plan Performance based. 
E)     Multi-Counter Plan.
.

4 comments:

  1. Both strategy plan for time based and performance based requires the maintenance strategy.

    ReplyDelete
  2. E) In multi-counter plan, you do not need a Maintenance Strategy. However, you will have to maintain a Cycle Set i order to create a multi-counter plan with more then one unit of measure eg: KM and HOURS.

    ReplyDelete
  3. A,B) Single Cycle Plans do not need a Maintenance Strategy as the MP only meant for fixed cycle from one unit of measure eg: every 3 month for one MP and every 5000km for another MP.

    ReplyDelete

Note: Only a member of this blog may post a comment.