This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Tuesday, August 13, 2013

Question no 2003 : Material Group Contract

In SAP MM ECC6.0, in creating the Material Group Contract, the following is valid.

(more then one answers)

A)  It must be a Value-based Contract.
B)  It can be either Value-based or Quantity-based Contract.
C)  The Unite of Measure in the Contract Line item is not required.
D)  The Item category used is "W".
E)  The Contract must be Account Assignment based.
.

2 comments:

  1. The following are the Characteristics of a Material Group Contract:
    . Doc type "WK" (Value-Based Contract)
    . Validity Period is mandatory
    . Total Value of Contract is mandatory
    . Item Cateogry "W" required
    . Account Assignment not necessary in the Contract
    . No material entry in the Contract Line
    . Description required in the Contract Line
    . No UOM needed in the Contract Line
    . No Contract qty needed in the Contract Line
    . No Price needed in the Contract Line

    ReplyDelete

Note: Only a member of this blog may post a comment.