In SAP MM and PP ECC6.0, which of the following parameters allows you to default the creation of Purchase Requisition for each material during an MRP run ?
(only one answer)
A) Material Type.
B) Material Group.
C) MRP Type.
D) MRP Controller.
E) MRP Group.
.
(only one answer)
A) Material Type.
B) Material Group.
C) MRP Type.
D) MRP Controller.
E) MRP Group.
.
IMG: MM - CBP - MRP Group - Carry Out Overall Maintenance of MRP Groups (Creation Indicator)
ReplyDeleteIMG: Production - MRP - MRP Group - Carry Out Overall Maintenance of MRP Groups (Creation Indicator)