Question no 1998 : MRP Scheduling

In SAP MM and PP ECC6.0, if the Planner Order Finish Date is equal to the Stock Available Date, what does that mean ?

(only one answer)

A)   Opening period is zero.
B)   Scheduling Margin Key was not assigned to the Material Master at MRP 2 view.
C)   Safety time is zero.
D)   GR Processing time is zero.
E)   Scheduling Parameter was incomplete.
.

1 comment:

  1. The GR Processing time in the Purchasing View or the MRP 2 view is used to determine the Stock Available Date of the Planned Order.