In SAP MM and PP ECC6.0, which of the following are correct when creating an MRP Area in the Customizing ?
(more then one answer)
A) The Receive Storage Location assignment is optional.
B) An MRP Area for Storage Location must be 5 or more alphanumeric.
C) An MRP Area for Subcontractor must be 5 ore more alphanumeric.
D) MRP Area number assignment are always external.
E) You can multiple MRP area for the same Plant and Storage Location.
.
(more then one answer)
A) The Receive Storage Location assignment is optional.
B) An MRP Area for Storage Location must be 5 or more alphanumeric.
C) An MRP Area for Subcontractor must be 5 ore more alphanumeric.
D) MRP Area number assignment are always external.
E) You can multiple MRP area for the same Plant and Storage Location.
.
Answer : B, C, D
ReplyDeleteMRP Area = Plant is 4 alphanumeric, others are 5 and above and it is always external number.