In SAP MM and PP ECC6.0, which of the following are correct when creating an MRP Area in the Customizing ?

(more then one answer)

A)  The Receive Storage Location assignment is optional.
B)  An MRP Area for Storage Location must be 5 or more alphanumeric.
C)  An MRP Area for Subcontractor must be 5 ore more alphanumeric.
D)  MRP Area number assignment are always external.
E)  You can multiple MRP area for the same Plant and Storage Location.
.