In SAP PP ECC6.0, a Material BOM which is created without a Plant is referred to as a _________ .
(only one answer)
A) Group BOM.
B) BOM without Plant.
C) Reference BOM.
D) Central BOM without Plant.
E) It is not possible to create a Material BOM without a Plant.
.
(only one answer)
A) Group BOM.
B) BOM without Plant.
C) Reference BOM.
D) Central BOM without Plant.
E) It is not possible to create a Material BOM without a Plant.
.
Answer: A
ReplyDeleteIt is referred to as a "Group BOM".
ReplyDelete