Question no 1999 : Block MRP Run

In SAP MM and PP ECC6.0, which of the following method is best to be considered for temporary blocking a material from being selected during an MRP run ?

(only one answer)

A)    De-activate the Plant for MRP Run.
B)    De-activate the MRP Group for MRP Run.
C)    Implement a user-exit to filter out the material from the MRP Run.
D)    Delete the MRP 1 and MRP 2 views from the material master.
E)    Assign an appropriate material status to the Material.
.

2 comments:

  1. The best choice to "temporarily" avoid a Material to be selected at an MRP run is to assign the material status, it can be removed any time.